MAINTENANCE MANUAL OF GW4D20/GW4D20B TURBOCHARGED DIESEL ENGINES
216
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
Section II Engine Assembly
Removal procedure
①
Transmission assembly and clutch assembly
②
Radiator assembly
③
Air intake pipe and air flow sensor
④
Air cleaner
⑤
Harness
⑥
Fuel hose
⑦
Oil pressure switch wire
⑧
Refrigerating compressor assembly
⑨
Power steering pump assembly
⑩
Catalytic converter pipe
○
11
Fastening nut of engine bracket
○
12
Engine assembly
Installation procedure
Reinstall them in the opposite order of
dismounting.