
YP1630F-1630 and YP1630F-1670
Preparation and Setup
Great Plains
| 401-832M | 2018-07-31
21
Monitor Setup
The standard DICKEY-john
®
PM400 system monitors
the following elements of a YP1630F planter:
•
seeds at each row unit seed tube;
•
dry fertilizer at each tower outlet;
•
ground speed; and,
•
fertilizer meter shaft speed.
Seed Monitor Console Installation
(11001-1372) for monitor operations.
After installation, and prior to first field use, the monitor
must be setup with the row spacing and speed sensor
constant, as well as your preferences for information
display. Row count is auto-assigned, but any other
DICKEY-john
®
defaults are not likely to be correct for
your planter.
Row spacing data may be found in the Appendix.
For speed setup, Great Plains recommends using the
400-foot (122 m) speed calibration described in the
DICKEY-john
®
manual. Perform the calibration run in
representative field conditions, as soil conditions, surface
looseness and other tillage practices can cause
variations in the effective rolling radius of the ground
drive wheel.
Prior to each planting session, set any desired limits for
speed and population for the current crop.
Marker Setup (Option)
Prior to first use, check and adjust:
•
Prior to first use, and whenever changing row spacings,
set or reset:
•
Prior to each planting session, check and adjust:
•
Figure 8
Monitor Primary Screen
31807
Содержание YP1630F-1630
Страница 134: ...Table of Contents Index Table of Contents Index...
Страница 140: ...Great Plains 401 832M 2018 07 31 Table of Contents Index 136 YP1630F 1630 and YP1630F 1670 Table of Contents Index...
Страница 141: ...Table of Contents Index Table of Contents Index...
Страница 142: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 Table of Contents Index...