3PYP
Adjustments
75
2018-07-24
401-312M
Meter Installation
Installation is the reverse of the removal process, with
two steps omitted.
1.
Insert the meter.
Insert the top meter tab (with the hook).
Align the meter base with the latch plate ears.
Insert the bottom meter tab.
Mind the lower latch, as it tends to swing under the
meter base and block mating with the latch plate.
2.
Engage the upper latch.
3.
Engage the lower latch, and swing the mounting
plate into engagement with the meter. it may be
necessary to spin the drive coupler to ease this.
4.
Slide the seed hose over the meter inlet tube, and
then slide the retaining ring down the seed hose.
5.
Release the upper latch.
Figure 95
Install Meter
25275
3
2
1
Figure 96
Upper Meter Latch
21922
Содержание Yield-Pro 3PYP
Страница 188: ...Cover Table of Contents Cover Table of Contents ...
Страница 189: ...Table of Contents Index Table of Contents Index ...
Страница 190: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...