![GREAT PLAINS NTA2007HD Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/great-plains/nta2007hd/nta2007hd_operators-manual_2259470065.webp)
Great Plains Manufacturing, Inc.
Operating Instructions
61
04/09/2019
166-283M
Field Operation
Perform all steps in “
and “
Null4:
Seed Monitor
The seed monitor performs the following functions:
• Drill lift switch monitoring
• Seed flow blockage
• Fan Speed monitoring
• Hopper material level monitoring
• Hopper air pressure monitoring
• Meter rate monitoring
(seed rate control, optional)
• Ground speed monitoring
Consult the DICKEY-john
®
Air Cart Control manual for
how to configure reporting and alerts.
Null4:
Do not make short radius turns with the drill in the ground.
Null4:
Note: If you stop in the middle of a pass, raise the drill
and back up 3m (10 ft) before resumption of seed-
ing.
Null4:
Null4:
Equipment Damage Risk:
On a new drill, check and adjust hopper strap tension before
and after each material load on the first day, then daily there-
after. Loose straps can result in excess meter oscillation as
hoppers near empty.
First Pass Operation Checklist
Page
1. Drill unfolded and aligned for first pass,
with opener disks about 3m (10ft) before
field edge.
2. Run fan for at least 15 minutes before
planting.
3. Unfold marker on next-row side.
4. Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust fan
hydraulic flow to obtain 3800 rpm.
5. Check seed monitor for alerts.
6. Pull forward, lower air drill, and begin
planting for a short distance.
7. Stop. Assess:
• coulter depth
• planting depth
• press wheel operation
8. Make necessary adjustments
a.
Refer to Seed Rate manual.
Sharp Field Turns Checklist
Page
1. Fold marker
2. Raise air drill
3. Make turn
4. Unfold marker on next-row side.
5. 3m (10ft) before field edge, lower pneu-
matic drill
6. Resume planting.
Suspending Planting Checklist
Page
1. Stop tractor
2. Fan hydraulic circuit to Float or Neutral
3. Fold Marker
4. Raise air drill
Ending Planting Checklist
Page
1. Suspend operations as above, then
2. Lift implement
3. Set tractor for fold
4. Fold wings
5. Lower implement to obtain lock
6. Lights ON for transport
Содержание NTA2007HD
Страница 32: ...28 Great Plains Manufacturing Inc Contents Index NTA607 2007HD 166 283M Contents Index 04 09 2019 ...
Страница 177: ...Contents Index 173 04 09 2019 Contents Index 166 283M BLANK ...
Страница 178: ...Great Plains Manufacturing Inc Corporate Office P O Box 5060 Salina Kansas 67402 5060 USA EOD ...