
Page
22
OPERATION MANUAL
Set Up / Operation
Steps:
1. After filling the hopper, set up a test course using two stakes placed 436 ft apart.
2. Read the label and cautionary statements of the granular chemical or recommended
rates for the seed you are using. Determine the rate you need to apply in pounds per
acre.
NOTE
Make sure the correct rate chart and the correct metering wheels are used for your
application.
Figure 11. Zero-Max
1. Gauge
2. Arrow
3. Look up the rate chart for the material and deflector/tube spacing. Set the speed control
on the applicator for your rate according to the chart. Make sure you align the arrow
by viewing the gauge at eye level on the Zero-Max. (If no chart is available for your
material, estimate a rate control setting based on a similar product in the rate chart.)
4. Place a plastic bag around each deflector tube end, securing it around the plastic tube,
leaving one-half of the top open to allow air to escape.
Содержание HT1100-40
Страница 2: ...This Page Intentionally Left Blank ...
Страница 16: ...Page 16 OPERATION MANUAL Set Up Operation WIRING CONNECTIONS 6245DS GP S1 ...
Страница 35: ...Page 35 OPERATION MANUAL THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 37: ...Page 37 OPERATION MANUAL THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...Great Plains Mfg Inc 1525 E North Street Salina Kansas 67401 USA www greatplainsmfg com ...