20
6000 Series
Great Plains Manufacturing, Inc.
562-094M
2015-01-05
Field Operations
Equipment Damage Risk:
Lift for tight turns and reverse moves. Tight turns can result in
a section moving backward. Never back up with the Ultra
Chisel in the ground.
Field Set-Up Checklists
Use the following tables to develop a final checklist for
your tractor/Ultra Chisel configuration. Additional or
fewer steps may be necessary depending on tractor fea-
tures, Ultra Chisel options and planting accessories.
Mechanical Checklist (Tractor Hitching)
❑
Ultra Chisel hitched
❑
Hitch pin locked.
❑
Safety chain secured to tractor or leading implement.
❑
Parking jack stowed
Electrical Checklist
❑
Verify electrical hookups solid, or connector securely
stowed if not using lights in field.
Hydraulic System Checklist
❑
Check tractor hydraulic reservoir full
❑
Make hydraulic connections
❑
Inspect connections for leaks
❑
Unfold Implement
Operations Checklists
Hitching
❑
Match hitch Category to tractor (page 13).
❑
Hookup hydraulic hoses (page 14).
❑
Hookup electrical connections (page 14).
Field Start
❑
Remove wing pins.
❑
Unfold the implement (page 17).
❑
Check levels (page 15).
Field Turns
❑
Raise implement completely.
❑
Make turn.
❑
Lower to field depth.
End Field Work
❑
Lift implement.
❑
Fold implement.
❑
Install wing pins and transport locks.
❑