3S-3000/F/HD/HDF
Operating Instructions
31
2018-06-18
195-441M
Unfolding
Drill must be lowered from transport lift prior to unfolding.
See “
Lowering Drill (Transport Lift)
1.
Verify that the site has clearance needed to unfold
drill.
2.
If markers are installed, set Marker/Fold valve at
hitch to Fold.
3.
Verify that the opener sub-frames are still raised and
locked up (handles in ROAD position).
4.
Slowly supply oil to base end of fold circuit. Unfold
wing frames by completely extending fold cylinders.
If field operations are planned:
5.
Position all six opener transport lock handles in
FIELD position.
6.
Completely raise openers to allow opener transport
locks to disengage.
NOTE:
The opener transport lock handles are spring loaded
and can be moved to field position with openers up or
down, but locks will only disengage when openers are
completely raised. There are two lock handles on
each drill section.
Folding and Unfolding Quick Reference
To Fold Drill for Transport
•
Fold markers (page 41).
•
Raise openers (page 24).
•
•
To Unfold Drill for Field
•
Lower drill (page 31).
•
Unfold drill (page 31).
•
Set openers for FIELD (page 24).
Figure 23 - Unfold
Opener Unlock
15549
Содержание 3S-3000-3210
Страница 116: ...Table of Contents Index Table of Contents Index ...
Страница 117: ...Table of Contents Index Table of Contents Index ...
Страница 118: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...