
72
1007NT
Great Plains Manufacturing, Inc.
150-290M
03/18/2019
Initial Setup
These items are completed by the dealer prior to deliver-
ing the drill to the customer.
Tools required
• Basic hand tools
• A tractor of sufficient size and horsepower with remote
hydraulics. Refer to “
Specifications and Capacities
”
in the Operator’s Manual.
If the tractor to be used with the drill is not available
during setup, obtain a measurement of its hitch height.
• About 2.3 gallons (8.4 liters) of hydraulic oil to refill the
tractor hydraulic reservoir after initial charging and
cycling of the hydraulic system.
Pre-Delivery Checklist
4. Read and understand “
” on page 1 before assembling.
5. Have a copy of the drill Parts Manual (150-290P) on
hand. If unsure of proper placement or use of any
part or fastener, refer to the Parts Manual.
6. Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
7. Check that all safety labels and reflectors are cor-
rectly located and legible. Replace if improperly
located or damaged. Refer to
Safety Decals
, in the
“
Important Safety Information
” section of the
implement Operator’s Manual.
8. Inflate tires to recommended pressure as listed on
9. Tighten wheel bolts as specified on “
10. Check for proper slack on all chains.
11. Obtain the hydraulic remote port type/size and hitch
height of the intended field tractor.
Содержание 1007NT
Страница 2: ...Blank...
Страница 63: ...Great Plains Manufacturing Inc Appendix A Reference 59 03 18 2019 150 290M Torque Values...
Страница 82: ...78 1007NT Great Plains Manufacturing Inc 150 290M 03 18 2019...
Страница 86: ...Great Plains Manufacturing Inc Corporate Office P O Box 5060 Salina Kansas 67402 5060 USA EOD...