
4
Hardware for Step 2:
4x #2 Wooden Dowels
STEP 2:
Prepare the top panel D by inserting 4x cam dowels (#3) and 4x 20mm
wooden dowels (#2) into the holes as shown.
STEP 3:
Orientate top panel D so that the grooved edge is on the floor.
Take both vertical divider panels E and connect to top panel D along the edge
with the larger drill holes as shown.
When in place, insert 2x cam locks (#4) into the large holes on BOTH panels
E and turn clockwise to secure.
4x #3 Cam Dowels
Hardware for Step 3:
4x #4 Cam Locks
#4
#4
Hardware for Step 1:
6x #1 Wood Screws (18mm)
STEP 1:
Working on a protective surface like a carpet or rug, position both side
panels A & B with drill holes facing up.
Using a phillips screwdriver, insert 2x cam dowels (#3) into the holes in the
corners of BOTH panels, then insert 2x 20mm wooden dowels (#2) into
the holes next to them.
Now take 2x support bars C and attach them to panels A & B using 3x
18mm wood screws (#1) on EACH bar.
#1
#1
#1
#1
#1
#1
#2
#2
#2
#2
4x #2 Wooden Dowels
4x #3 Cam Dowels
A
C
C
B
D
D
#3
#3
#3
#3
#3
#3
#3
#3
#2
#2
#2
#2
E
E
#4
#4
Using Cam Locks:
When inserting into the
panel, ensure that each cam
lock’s arrow is pointing
towards the drill hole on
the side edge of the panel
& the dowel that it will be
receiving.
When the panels are in the
connected position, using a
screwdriver, turn the cam
lock in a clockwise direction
to lock and secure.