Great Lakes VRX Highlander Скачать руководство пользователя страница 13

POWER AND GROUNDING OF ALL RACKS

When using PDUs, each PDU should be connected to a committed branch circuit that is rated 
for the continuous load of all the equipment connected.  When not using a PDU, each piece of 
equipment should be connected to a dedicated branch circuit.

PROTECTIVE EARTHING/GROUNDING

A main protective earthing stud is provided.

 

WARNING:

 

To avoid injury to persons or loss of life, ground rack individually to the dedicated branch circuit 

earthing ground.

CONNECTING MAIN PROTECTIVE EARTHING STUD TO THE DEDICATED BRANCH CIRCUIT 

EARTHING GROUND CONDUCTOR

Connect the dedicated branch circuit earthing ground conductor to the main protective earthing 
stud located on the support frame using a listed ring or closed-loop terminal.

PARTS NOT BONDED TO PROTECTIVE EARTHING TERMINAL

The following parts are not effectively bonded to the protective earthing terminal: Top Cable 
Waterfall. If these parts need to be bonded to the protective earthing terminal, do so in accordance 
with Article 250 of the National Electric Code.

Although equipment may physically fit into a Great Lakes rack, with or without brackets, 
customers must also review and comply with the equipment manufacturer’s installation and 
other requirements.  For more information, please contact your Great Lakes representative or call 
1-866-TRY-GLCC.

When any equipment or accessory is installed in a Great Lakes product, the installation procedures, 
recommendations and product warranty requirements of the equipment manufacturer must be 
followed.  Great Lakes will not be responsible for any losses or claims arising from a customer’s 
installation of electrical, electronic or other third party products in any Great Lakes racks, unless 
caused solely by a written configuration prepared by Great Lakes for that customer or by a 
configuration provided by Great Lakes’ website, any configuration relies on complete and accurate 

information from the customer.

Product specifications are subject to change without prior notice.

13

Содержание VRX Highlander

Страница 1: ...1 866 879 4522 GreatCabinets com 5 5 6 6 7 7 8 8 A B C D 3 VRX Highlander Variable Depth Racks Metric Installation Instructions...

Страница 2: ......

Страница 3: ...EFORE ASSEMBLY PLEASE SEE PAGE 14 FOR SAFETY CONSIDERATIONS INSTALLATION RECEIVING UNPACKING AND REMOVING THE RACK Inspect and report damage before receiving Unpack the rack by carefully removing the...

Страница 4: ...tions UL2416 Listed Construction Vertical Uprights 12 ga steel Cross Members 14 ga steel Extension Bars 12 ga steel Bottom Width Brackets 12 ga steel Top Width Brackets 14 ga steel Finish Steel White...

Страница 5: ...Upright Top Width Bracket Bottom Width Bracket When assembled a cross member and extension bar create the variable depth cross member assembly Diagram E see page 8 Front Extension Bar Rear Cross Memb...

Страница 6: ...T BOTTOM RIGHT DETAIL FBL FTR FRONT BOTTOM LEFT FRONT TOP RIGHT DETAIL RTL RBR REAR TOP LEFT REAR BOTTOM RIGHT D R R 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A B C D Single Hole ETAIL FTL FBR RONT TOP LEFT RONT BO...

Страница 7: ...t and nut in square hole between tabs shown in DIAGRAM D Once the cross members and extension bars have been assembled the variable depth cross member assembly can be mounted to the uprights see DIAGR...

Страница 8: ...0 x 20mm lg Hex Head Bolt M10 Ext Tooth Washer M10 Ext Tooth Washer M10 Nut Plate DIAGRAM F M10 Ext Tooth Washer 2 Assemble top width brackets to vertical uprights DO NOT TIGHTEN DETAIL E SCALE 75 DET...

Страница 9: ...rdware is Great Lakes Seismic Anchor Kit AK101 or HDW 4 FLMT M For other floor construction the installer must provide all appropriate hardware DIAGRAM G 75 Four locations TOE IN RACK DEPTH MINUS 2 22...

Страница 10: ...the top bolt of the 4 post rack NOTE Do not tighten any hardware until carriage bolts are in place 8 Secure the sides of the VCMX to rack with M6 carriage bolts washers and M6 nuts as shown in DIAGRAM...

Страница 11: ...3 4 5 6 7 2 3 4 5 M6 Carriage bolt Flat Washer M6 Nut M10 Hex Bolt Loosen but DO NOT remove Star Washer Rack DIAGRAM H Auxiliary Foot DIAGRAM J VCMX INSTALLATION ON RACK CONTINUED 11...

Страница 12: ...in locations as shown 12 Top cable waterfall must be installed after installing VCMX Secure both front and back waterfalls with M6 carriage bolts star washers and nuts as shown in Diagram J DIAGRAM K...

Страница 13: ...l If these parts need to be bonded to the protective earthing terminal do so in accordance with Article 250 of the National Electric Code Although equipment may physically fit into a Great Lakes rack...

Страница 14: ...viest equipment first at the bottom of the ER Rack and load the lighter units at the top Only UL Listed ITE Information Technology Equipment units should be installed inside the rack Be sure to read a...

Страница 15: ......

Страница 16: ...FORM MS 5 02 64HL M Rev 5 Thank you for your business ETSI Associate Member...

Отзывы: