Great Lakes GL720E-2432 Скачать руководство пользователя страница 5

5

OPERATING DOOR HANDLE

The door swing handles have been installed and no additional assembly 

is required. To operate the swing handle, lift up at the bottom of the 

handle to open. Swing the handle

to the left or right to open.

The handle must be kept

in this position to close

the door. Return the handle

to the initial position

and use the key provided

to lock the handle. The

lock on the side panels

will accept the same key.

The swing handles and

doors are reversible. The

exploded view shows its

construction.

OPERATING DOOR SWING HANDLE

OPERATING DOOR SWING HANDLE

INTERCHANGING DOOR HANDLES 

Door handles on all doors can be interchanged with any one of Great 

Lakes optional swing handles: CH-02 (three-digit combination lock 

and key); CH-03 (padlock with key lock); or CH-04 (padlock). When 

interchanging the handle, the type of door will determine the type of 

cam that is required to properly install the handle; when ordering the 

handle, Great Lakes will determine if additional cams are required.

 

(1

.0

0)

TH

K

 

(1

.0

0)

TH

K

ASSEMBLY OF SWING-LATCH HANDLE ON CONTOUR MESH DOOR

Deeper cam 

required on contour 

mesh doors with 

Swing-latch

Swing-latch 

handle 

without cam; 

pull out and 

rotate to open 

and close

FRONT 

DETAIL

SIDE 

DETAIL

CROSS 

VEIW

 

(1

.0

0)

TH

K

Содержание GL720E-2432

Страница 1: ...nclosures GL720E 2432 GL720E 2436 GL720E 2932 GL720E 2936 GL840E 2432 GL840E 2436 GL840E 2932 GL840E 2936 E Series Enclosures Installation Instructions UL60950 1 UL2416 E Series Equipment Cabinet Rack...

Страница 2: ...the E Enclosure could result in equipment damage serious injury or possible death Only trained service personnel should be used to remove the enclosure from the pallet Also be sure you have a suffici...

Страница 3: ...needed depending on configuration 50 M6 cage nuts 3 8 square and M6 screws 10 32 tapped rails available must be specified at time of order This user s manual This user s manual applies to the followin...

Страница 4: ...ing enclosures before installation Sudden stops and starts excessive force obstructed routes and uneven floor surfaces may cause the enclosure to topple over Loading Equipment WARNING Only install equ...

Страница 5: ...NG DOOR SWING HANDLE OPERATING DOOR SWING HANDLE INTERCHANGING DOOR HANDLES Door handles on all doors can be interchanged with any one of Great Lakes optional swing handles CH 02 three digit combinati...

Страница 6: ...note The easy latch slam is not compatible with 3 point latching split doors ASSEMBLYOFSWING LATCHHANDLEONALLOTHERDOORS STANDARD MESH STEEL PLEXIGLAS AND PERIMETER VENTED DOORS 5 0 T H K Standard fla...

Страница 7: ...hree hinge pins pull the door away from the enclosure To attach the door align all three hinges of the door to their respective hinge pins on the enclosure and slowly slide the door down until seated...

Страница 8: ...MOUNTING SIDE PANEL REMOVAL Before removing the side panel pull apart the quick disconnect grounding wires The side panels are secured to the enclosure frame with two quick release latches and a keyed...

Страница 9: ...3 thds and will accept the levelers Once the levelers 7209 HD or 7209 4HD are installed the cabinet level can be adjusted with the use of a 5 8 open wrench when adjusting from the outside or a 3 8 clo...

Страница 10: ...TPE F TPE F10 TPE 2F10 Solid Perforated Three One 10 550 Two 10 550 75 CFM Fans CFM Fan CFM Fans BOTTOM PANELS There are several styles of panels available for the bottom of your E Series enclosure O...

Страница 11: ...sure has two pairs 12 ga steel powder coated rails come installed with all standard frames at 19 EIA 310 E The 29 W E enclosure can be configured to 23 EIA mounting with an optional replacement bracke...

Страница 12: ...he power strip into the corner post of the frame and then place one bracket between the top two outlets and install the 10 32 x 1 2 screw into the threaded hole in the frame Then place the other brack...

Страница 13: ...nt Universal Power Strip Brackets in an E enclosure or cabinet extension measure the required mounting distance top to bottom install brackets then install power strip Spring Clips Tinnerman Clips 10...

Страница 14: ...kit of 24 sections Fingers can be installed on the front or rear rails but front rails must be recessed 4 5 for proper installation It is recommended that each CM 47 be installed using 3 points of at...

Страница 15: ...so available Additional horizontal bars can be installed alone without a vertical bar or in conjunction with a kit Additional vertical bars can only mount when at least two horizontal bars are already...

Страница 16: ...e VCB 7236 Cable Management Bar Kit for 720E 36 enclosure VCB 8432 Cable Management Bar Kit for 840E 32 enclosure VCB 8436 Cable Management Bar Kit for 840E 36 enclosure VCB 72 Single Vertical Cable B...

Страница 17: ...tallation in a Great Lakes E Enclosure is identical ZERO RMU MOUNTING ZR1 ZR2 Both ZR bracket kits fit on the 29 W E enclosure These allow for 0 RMU outside of the EIA rail pattern mounting of 19 rack...

Страница 18: ...to the common building ground The kit contains one 48 L ground wire assembly and five 24 L ground wire assemblies Each assembly is made of two smaller wires that are connected this allows a Quick Dis...

Страница 19: ...individual devices and components mounted within an enclosure to be grounded they must be connected to a copper bus bar Available copper bus bars include CBB 19 Copper Bus Bar for 19 rack mounting Is...

Страница 20: ...FORM MS 5 02 58 REV 0 ETSI Associate Member Thank you for your business...

Отзывы: