EN
instalation
These are the steps to follow for correct assembly of the
platform:
- Position the surrounds (fig.19)
(They were removed in step 1)
- Position the floor following the sequence order (fig.20)
- Cut the marked planks to adapt them properly (fig.20
and fig.21)
NB:
The cut shown in fig. 21 is a recommendation. You are free
to do otherwise under your own responsibility.
- Screw in all the parts with 4x60 screws (fig.22)
13
12
10
9
8
7
1
2
3
4
5
6
11
13
12
10
9
8
7
1
2
3
4
5
6
11
13
12
10
9
8
7
1
2
3
4
5
6
11
Fig. 19
Fig. 22
Fig. 21
ref nº
description
qty
9
MARG STD 28x145x115
1
10
MARG STD 28x145x260
1
11
MARG STD 28x145x405
1
12
MARG STD 28x145x550
1
14
MARG STD 28x145x695
1
15
MARG STD 28x145x840
1
16
MARG STD 28x145x985
1
23
MARG STD 28x145x2634
6
23
17
22
18
32
1
6
3
36
35
5
4
13
19
20
23
32
32
21
21
23
16
15
14
12
11
10 9
23
13
12
10
9
8
7
1
2
3
4
5
6
11
Fig. 20
ASSEMBLING THE PLATFORM
17