
136
KARRERA K-FRAME — Installation & Service Manual
Section 5 — Basic Configuration
6.
Touch a LAP 1-4 button to assign that look ahead to that Tributary
(
Figure 91. Look Ahead Preview Tally
7.
to assign all the desired look aheads to the
calculation.
8.
To activate this calculator, touch the
Calc On
button so it is highlighted.
Note
Though the calculator is activated, it will not actually affect Video Processor
Frame relay contacts until that calculator has been assigned to a Tally Group
(see
).
Creating a Bus Tally Calculator
Bus tallies report what source(s) are currently selected on a particular set of
buses, and does not trace tributaries upstream.
Use the Look Ahead Preview procedure above, but choose PGM/PST, ME,
or Aux, on the left, and then select the desired bus in the center of the
screen. Repeat for all the buses you wish to tally for that (
).
Содержание KARRERA K-FRAME
Страница 12: ...12 KARRERA K FRAME Installation Service Manual Contents ...
Страница 30: ...30 KARRERA K FRAME Installation Service Manual Regulatory Notices ...
Страница 56: ...56 KARRERA K FRAME Installation Service Manual Section 2 Control Surface Installation ...
Страница 152: ...152 KARRERA K FRAME Installation Service Manual Section 5 Basic Configuration Figure 104 FBWF Manager ...
Страница 266: ...266 KARRERA K FRAME Installation Service Manual Appendix B Field Replaceable Units ...
Страница 278: ...278 KARRERA K FRAME Installation Service Manual Index ...