background image

Page 10

Orbital shak

er

 P

SU-10i

Operating instructions

Version 

3.0

2

 - 

August 

20

12

Содержание PSU-10i

Страница 1: ...Operating instructions Orbital shaker PSU 10i For version V 3GW ...

Страница 2: ...2 Orbital shaker PSU 10i Operating instructions Version 3 02 August 2012 Contents 1 Safety 3 2 General Information 5 3 Getting Started 6 4 Operation of PSU 10i 7 5 Specifications 8 6 Guarantee and service 10 ...

Страница 3: ...transported in a horizontal position see package label After transport or storage allow the unit to dry out 2 3 hrs before connecting to the supply voltage Before using any cleaning or decontamination method except those recommended by the manufacturer check with the manufacturer that the proposed method will not damage the equipment Do not make modifications to the design of the unit 1 4 ELECTRIC...

Страница 4: ...Do not operate the unit if it is faulty or been incorrectly installed For indoor use only Do not use outside laboratory rooms Do not place a load exceeding maximum loading mentioned in p Specifications 1 6 BIOLOGICAL SAFETY It is the user s responsibility to carry out appropriate decontamination if hazardous material is spilt on or inside the equipment DURING OPERATION Version 3 02 August 2012 ...

Страница 5: ...ers can provide stable continuous mixing up to 7 daynights PSU 10i with its wide speed range loading up to 3 kg and extensive choice of platforms is applicable in different laboratories in microbiology chemistry immunology biochemistry and molecular biology Biotechnology and microbiology for microorganism cultivation and extraction of biologically active substance Immunology and biochemistry for a...

Страница 6: ... 4 v on request Platform P12 100 w on request Platform P6 250 x on request Platform P16 88 y on request Additional holding bar HB 200 z on request 3 4 Set up place the unit on the horizontal even working surface plug the external power supply unit into the 12 V socket at the rear side of the unit 3 5 Platform installation Install the platform by inserting the pins on the underside of the platform ...

Страница 7: ...play 4 6 At the end of the program after the set time elapses the platform motion stops and in the lower line of the display shows the flashing reading STOP accompanied by the repetitive sound signal until the Run Stop key is pressed 4 7 If necessary the unit can be stopped before the set time elapsed by pressing Run Stop key The Time control indicator will show the set time interval To repeat the...

Страница 8: ...0x205x90 mm Input current power consumption 12V 800 mA 9 6 W External power supply input AC 100 240 V 50 60Hz output DC 12V Weight with power supply w out platform not more 4 0 kg Grant is committed to a continuous program of improvement specifications may be changed without notice Description Optional accessories Universal platform with adjustable bars for different types of flasks bottles and be...

Страница 9: ...is guaranteed for TWO YEARS against faulty materials or workmanship 6 2 Service For service return for repair to our Service Department in the UK or in other countries to our distributor 6 3 Cleaning Disinfection Standard ethanol 75 or other cleaning agents recommended for cleaning of laboratory equipment can be used for cleaning and disinfection of the unit Version 3 02 August 2012 ...

Страница 10: ...Page 10 Orbital shaker PSU 10i Operating instructions Version 3 02 August 2012 ...

Страница 11: ...Page 11 Orbital shaker PSU 10i Operating instructions Version 3 02 August 2012 ...

Страница 12: ...tal shaker PSU 10i 29291 3 02 Grant Instruments Cambridge Ltd Shepreth Cambridgeshire SG8 6GB UK Tel 44 0 1763 260811 Fax 44 0 1763 262410 Email scientificsales grantinstruments com www grantinstruments com ...

Отзывы: