background image

1-1

1-2

1-3

2-1

2-2

2-3

2-6

2-4

2-5

1

2

GPCN-E200

GPCN-E3540

GPCN-E4560

Perpendicular 

to the ground

Parts

GPCN-E is combined by GPCN and GPE

GPCN Main Bar Overview
1-1  Top Cap
1-2  Fixation
1-3  Sliding Adjusting Hole
2-1  Main Bar
2-2  Subsidiary Bar
2-3  Front Ornament Board
2-4  Back Ornament Board of Main Bar
2-5  Back Ornament Board of Subsidiary Bar
2-6  Moving Button

GPE Adjusting Overview
3-1  Adjuster
3-2  Horizontal Adjusting 
         Button
3-3  Vertical Adjusting 
         Button
3-4  Rotation Adjusting 
         Screw
4-1  Installation Bracket
4-2  Installation Arm
4-3  Adjustable Screw
4-4  Sliding Installation 
         Button
4-5  Installation Base

Accessories:
①     6x50 Wood Screw (4pcs)
② M5x16 Philips Screw (6pcs)
③ M5x8 Philips Screw (6pcs)
④ M3x8 Philips Screw (4pcs)
⑤ M4x8 Philips Screw (4pcs)
⑥ M5x8 Philips Screw (4pcs)
⑦     6x25 Tapping Screw (4pcs) 

Scope for installation (Installation hole of projector):
Maximum scope for installation:390mm diameter
Minimum scope for installation:20mm diameter

Note: Connect the installation arms to the projector conversely for different installation 
holes of projector.

Scope

Maximum diameter: 390mm

Minimum diameter: 20mm

Scope for installation (H is the distance between ceiling and projector)
The H of GPCN-E200 is 250mm
The H of GPCN-E3540 is 350mm~400mm
The H of GPCN-E4560 is 450mm~600mm

Scope

Install  the  fixation  on  the  ceiling  (screws  of  accessory  ① or  ⑦ )  as 
figure  1,  and  the  fixation  also  can  be  installed  on  the  ceiling  which 
angle is less than 15°as figure 2. GPCN-E can be installed to the 
concrete-roof  with  ceiling  or  without  ceiling,  such  as  figure  3  and 
figure 4.

figure 1

figure 2

figure 4

figure 3

Steps of installation

Steps of installation

Connect the adjuster to GPCN Main Bar Overview, and then fasten 
the  screws  (accessory  ② )  as  figure  5.  Afterward,  slide  the 
Adjustment  Overview  (projecter  has  been  installed)  to    adjuster, 
and the fasten the screws (accessory ③) as figure 6.Finally install 
the  top  cap  to  the  main  bar,  and  then  invaginate  the  spring.  as 
figure 7

figure 5

Details of installation

Wires collection

If the volume of power wire is less than diameter of main bar (2-1) that 
please put this power cord inside the main bar directly. But if the volume 
is  greater  than  the  diameter,  please  take  apart  back  ormanent  board 
(2-4  and  2-5)  and  positioning  button  (2-6)  from  main  bar  (2-1)as 
figure8. And then stay the power wire into the main bar (2-1)as figure 9. 
Finally,  re-install  the  back  ornament  board  (2-4)  from  the  other  end, 
and then install positioning button (2-6) and back ornament board (2-
5), figure 10.

figure 8

figure 9

figure 10

figure 6

4-1

4-2

4-3

4-4
4-5

3-4

3-1

3-2

3-3

H

H

H

figure 6

figure 7

Отзывы: