background image

1-1

1-2
1-3

2-1

2-2

2-3

3-1

3-2

3-3

4-1
4-2
4-3

4-5
4-6

4-4

2-6

2-4

2-5

1

3

2

Install on 

the flat 

ceiling

GPCN-D200

GPCN-D30/40

GPCN-D40/60

Connect 

main bar 

and  adjuster 

(screws of 

accessory ④)

Parts

GPCN-D is combined by GPCN and GPD

GPCN Main Bar Overview
1-1  Top Cap
1-2  Fixation
1-3  Sliding Adjusting Hole
2-1  Main Bar
2-2  Subsidiary Bar
2-3  Front Ornament Board
2-4  Back Ornament Board of Main Bar
2-5  Back Ornament Board of Subsidiary Bar
2-6  Moving Button

GPD Adjustment Overview
3-1  Adjuster
3-2  Hanging Button
3-3  Horizontal Adjusting 
         Hole
4-1  Installation Bracket
4-2  Vertical Adjusting Hole
4-3  Installation Arm
4-4  Adjustable Nut
4-5  Sliding Installation 
         Button
4-6  Installation Base 

Accessories:
① M6x25 Tapping Screw (4sets)
②     6x50 Wood Screw (4pcs)
③ M5x8 Philips Screw (2pcs)
④ M5x10 Philips Screw (6pcs)
⑤ M5x30 Philips Screw (4pcs)
⑥ M4x30 Philips Screw (4pcs)
⑦ M3x30 Philips Screw (4pcs)     

Scope for installation (Installation hole of projector):
Maximum scope for installation:310mm diameter
Minimum scope for installation:40mm diameter

Note: Connect the installation arms to the projector conversely for different installation 
holes of projector.

Scope

Maximum diameter: 310mm

Minimum diameter: 40mm

Scope for installation (H is the distance between ceiling and projector)
The H of GPCN-D200 is 200mm
The H of GPCN-D30/40 is 300mm~400mm
The H of GPCN-D40/60 is 400mm~600mm

Scope

Three steps of installation

Install  the  fixation  on  the  ceiling  (screws  of  accessory  ① or  ⑧ )as 
figure  1,  and  the  fixation  also  can  be  installed  on  the  ceiling  which 
angle is less than 15°as figure 2. GPCN-D can be installed to the 
concrete-roof with ceiling or without ceiling, such as figure 3.

Connect  the  GPCN  Main  Bar  Overview  to  the  fixation  (screws  of 
accessory ④ ). Store the power wire, and then fasten the front and 
back  screws  of  main  bar.  Finally,  install  the  ornament  board  of 
main bar as figure 4 and figure 5. 

Hang  the  installation  bracket  (projecter  has  been  installed)  to  the 
adjuster as figure 6. And then put in the screws (accessory ④).but 
do not fasten.Pull the top cup to the main bar, and then invaginate 
the spring,figure 7

Install on 

the ceiling 

which angle 

is less than 

15°

Three steps of installation

figure 1

figure 2

figure 3

figure 4

figure 5

H

H

H

15°

figure 6

figure 7

Отзывы: