
7
2
Product structure
Installation Instruction
Case
Installation plate
Right trestle
Right cap
Left trestle
Power line
Left cap
Limit
adjusting
Fabric
Installation plate
Installation
plate
Power line
Left cap
lower limit
adjusting hole
Mounting hole
Left cap
Fabric rod
integration
Installation plate
10. Installation of left/right decoration cap. Insert the fixing legs (diagram 19) of decoration cap aslope into slots
from the two edges of decoration board (diagram 20). Please push upward tightly (diagram 21) and the decoration
cap would be attached to left/right trestles by magnet (see diagram 19-21).
Note:
Please make it clear the left and right decoration caps. Please pay attention to the decoration strip. After the
decoration caps are fixed, the decoration strips should be in line with those on the decoration board (diagram 22-
23)
If the seam seems too big at the joint, please push the decoration cap toward the screen to make it in position.
Fixing leg
Slot
1.Insertion into slot
2.Push
upward
tightly
left/right
trestles
Slot
Magnet
Fixing leg
Decoration strips in line
Decoration strips in line
Push the middle forward if seam is
too big at
the joint
Left decoration cap
Right decoration cap
Diagram 19
Diagram 22
Diagram 21
Diagram 24
Diagram 20
Diagram 23