18
1.7
Slide the BA-C3 into the BA-S7, slide the BA-S2 into the BA-C3, align the holes and push together to an even and tight
position and use the BA-S03 Bolt and BA-M03 Collard Nut combo, tighten the collard nut on the inside of the base kit using the
10mm wrench. Repeat this process on all corners. See and .
Note: BA-S7 will be the front and back, while the BA-S2’ s will be the sides of your greenhouse base, if using a 4’ extension you
will attach the BA-S5 and BA-S6 accordingly.
1.8
For Ground Installation only
Insert the BA-S03 and the BA-A1 into the holes at the bottom side of the corners of
the base, the nut will be tightened on the inside of base, see and . Locate the anchoring devices for your
installation needs and follow the directions for that anchoring system. If you have not purchased an anchoring
system please go to www.GrandioGreenhouses.com for anchoring kit options.
BASE KIT ASSEMBLY INSTRUCTIONS
BA-S7
BA-S2
FRONT
SIDE
BA-C3
BA-S03
BA-M03
BA-C3
BA-S7
BA-S2
BA-S03
BA-M03 Collared Nut
BA-S03
BA-M03 Collared Nut
BA-S03
BA-C4
BA-S5
BA-S2
BA-S03
BA-M03
BA-S10
HOLE FOR
ANCHOR
HOLE FOR
ANCHOR
HOLE FOR
ANCHOR
Содержание Grandio Element 6x4 with Base Kit
Страница 67: ...NOTES NOTES...