
OPERATING THE CRAFT
58
BILGE PUMP
The bilge pump serves to pump water out of the bilge area of the boat.
Fig. 24. Bilge pump location.
The bilge pump is located in the water
collector. Open the hatch to get access
to the pump.
Pump specifications:
Capacity 1.9 m
3
/h (with zero head).
Power 12 V/1.6 А.
Maximum head 3 m.
Connection 3/4”.
Switching the bilge pump on/off is done manually by
using the switch located on the steering console.
Make sure the inlet channels are free from
contamination (see also sections - “SAFETY”, “RISK
OF FLOODING AND STABILITY”, “SAFETY
EQUIPMENT”).
Содержание Silver Line S520
Страница 1: ......
Страница 2: ...CONTENTS...
Страница 3: ......
Страница 4: ...CONTENTS...
Страница 68: ...OPERATING THE CRAFT 68 HIGH CAPACITY 200 LITER BOW LOCKER Fig 31 Bow locker...
Страница 70: ...OPERATING THE CRAFT 70 BOW STEP PLATE IF APPLICABLE Fig 33 Bow step plate Clam bollard...
Страница 84: ...TECHNICAL DETAILS 84 GENERAL VIEW OF A BOAT S520S Fig 43 General view of a boat S520S...
Страница 86: ...TECHNICAL DETAILS 86 LOADING PASSENGERS FOR S520S F Fig 45 Recommended seating arrangement for 9 persons...
Страница 88: ...TECHNICAL DETAILS 88 ELECTRICAL SCHEMATIC DIAGRAM Fig 47 Electrical schematic diagram...
Страница 102: ...FOR YOUR NOTES...
Страница 103: ......
Страница 104: ......