
OPERATING THE CRAFT
44
Begin the inflation procedure according to the sequence shown in figure 9. Initially, partially inflate
each chamber (approx. 0.1 bar (1.45 psi) then repeat the procedure inflating each chamber to its
nominal pressure, 0.15 bar (2.15 psi).
The nominal pressure is 0,15 bar (2,15 psi).
Fig. 9. Tube inflation sequence.
Check the pressure in each chamber with a pressure gauge. If you do not have a pressure gauge
the following procedure will serve as a guide. Press a finger firmly against the tube – if the tube is
depressed by about 10 mm (⅜ inch) this indicates that the pressure is approximately correct.
After the tube chambers have been inflated to the nominal pressure replace the valve caps. Fit the
caps to the valve body and turn clockwise until secure.
Содержание Golden Line G240
Страница 1: ......
Страница 2: ...CONTENTS...
Страница 3: ......
Страница 4: ...4...
Страница 65: ...OPERATING THE CRAFT 65 Golden Line G420 Owner s Manual OVERALL COVER IF APPLICABLE Fig 28 Overall cover...
Страница 82: ...TECHNICAL DETAILS 82 Fig 38 Steering console components see the list on the next page 2 3 4 5 8 7 6 11 9 10...
Страница 84: ...TECHNICAL DETAILS 84 GENERAL VIEW OF A BOAT Fig 39 General view of a boat...
Страница 85: ...TECHNICAL DETAILS 85 Golden Line G420 Owner s Manual LOADING PASSENGERS Fig 40 Recommended seating arrangement...
Страница 86: ...TECHNICAL DETAILS 86 ELECTRICAL SCHEMATIC DIAGRAM Fig 41 Electrical schematic diagram...
Страница 100: ...FOR YOUR NOTES...
Страница 101: ......
Страница 102: ......