background image

32

Functional tests 

Complete functional tests should be carried out after installation:

Ensure both power supply cords are connected before use! 

Test run the lift unit up and down all the way to each end position. Make sure that the lift runs

 

freely without obstacles, risk of pinching and noise. Make sure it remains at each end position. 

Make sure that no cables get pinched and that they are fixed. 

Lower the lift and test the function of the anti-pinch strip all around the frame. Press on it while lowering.

 

The lift should stop immediately and rise to free up space when anti-pinch protection is activated.

 

 

 

Tests fonctionnels 

Des tests fonctionnels complets doivent être effectués après l'installation :

Avant de l’utiliser, assurez-vous que les deux cordons d’alimentation sont branchés! 

Testez l'unité de levage de haut en bas jusqu'à chaque position finale. Assurez-vous que l'élévateur fonctionne

 

librement sans obstacle, risque de pincement et bruit. Assurez-vous qu'il reste à chaque position finale. 

Assurez-vous qu'aucun câble ne se coince et qu'ils sont fixés. 

Abaissez l’élévateur et testez le fonctionnement de la bande anti-pincement tout autour du cadre. Appuyez dessus pendant la descente.

 

L'élévateur doit s'arrêter immédiatement et remonter pour libérer de l'espace lorsque la protection anti-pincement est activée.

Содержание Baselift Corner 6311H

Страница 1: ...Dok Nr M6311 ETL V 1 0 2021 10 04 WWW Baselift Corner 6311 6311L 40mm 6311H 103mm Installation Instructions Instructions d installation Baselift Corner 6311H 6311L 1 6 4 1...

Страница 2: ...pping over SAVE THESE INSTRUCTIONS FR Lorsque vous utilisez un mobilier commande lectrique les pr cautions de base doivent toujours tre observ es notam ment les suivantes Lisez toutes les instructions...

Страница 3: ...uit de Granberg Pour que le produit fonctionne en toute s curit il est extr mement essentiel de suivre instructions d installation L installateur doit lire et comprendre toutes les instructions d inst...

Страница 4: ...k of crushing against other solid interior fittings If the lift is placed in front of a flat wall the gap should not be below 0 2 5mm or exceed 0 31 8mm FR Tr s important V rifiez la stabilit du sol a...

Страница 5: ...has a sink the connections for electricity water and drain should be placed centrally below the mixer The electrical connection can also be placed in a protected position inside a motor unit FR L uni...

Страница 6: ...6 16 mm M8 6x M8x16mm 2x M8 2x M8X45 16 mm 48x 3x12 mm 4x M6 x 60mm 4x M6 4x BR M6x16 8x M6x12 16 mm 24x 3x16 mm 2x 6x 4x 2x 8x 2x Content of delivery Contenu de la livraison Accessories Accessoires...

Страница 7: ...7 CL960 1 L R LEFT L RIGHT R R L 930 930 36 6 930mm 36 6 930mm...

Страница 8: ...8 CL960 2...

Страница 9: ...9 CL960 3 16 mm M8 6x M8x16mm 13...

Страница 10: ...10 CL960 4x M6 x 60mm 10 4 4x M6 Anti pinch strip Bande anti pincement BR M6x16 HEX 5 32...

Страница 11: ...11 CL960 5 13 180...

Страница 12: ...12 CL960 6 L...

Страница 13: ...13 CL960 7 R...

Страница 14: ...14 CL960 8 22 04 23 2 560 590mm 13 22 04 23 2 560 590mm...

Страница 15: ...15 CL960 9 13 2x M8 2x M8X45 10 mm...

Страница 16: ...16 CL960 10...

Страница 17: ...17 CL960 11...

Страница 18: ...18 CL960 12 230V WARNING Ensure both power supply cords are connected before use AVERTISSEMENT Avant utilisation assurez vous que les deux cordons d alimentation sont branch s 2x...

Страница 19: ...nberg Interior AB Tel 46 0 11197750 info granberg se www granberg se F r o n t f s t e n 1 0 4 3 3 W E I G H T A 3 S H E E T 1 O F 1 S C A L E 2 1 D W G N O T I T L E R E V I S I O N D O N O T S C A L...

Страница 20: ...20 CL960 Glue Colle 14 min 0 2 5 mm min 0 2 5 mm...

Страница 21: ...21 CL960 15...

Страница 22: ...22 CL960 Glue Colle 16...

Страница 23: ...23 CL960 17 8x 8x M6x12 HEX 1 8...

Страница 24: ...LINEAR SS ISO 2768 m ANGULAR SS ISO 2768 m DRAWN CHECKED Granberg Interior AB Tel 46 0 11197750 info granberg se www granberg se WEIGHT DO NOT SCALE DRAWING MATERIAL DEBUR AND BREAK SHARP EDGES UNLESS...

Страница 25: ...8 m DRAWN CHECKED T10 16 mm 12x 3 x 16 mm 700 1000 119 1045 1045 R L 560 590 560 590 5 6 8 4 7 9 32 16 WEIGHT DO NOT SCALE DRAWING MATERIAL DEBUR AND BREAK SHARP EDGES UNLESS OTHERWISE SPECIFIED DIMEN...

Страница 26: ...26 CL960 T10 16 mm 8x 3 x 12 mm 20 8 mm 0 315...

Страница 27: ...Interior AB Tel 46 0 11197750 info granberg se www granberg se 34 68 881mm 0 315 8m 3 85 98mm 0 78 20mm 0 98 25mm 0 78 20mm 34 68 881mm 0 78 20mm 3 85 98mm 2x 0 315 8mm 0 98 25mm 0 78 20mm 2x T ckski...

Страница 28: ...68 m ANGULAR SS ISO 2768 m DRAWN CHECKED Granberg Interior AB Tel 46 0 11197750 info granberg se www granberg se L R 1x L 1x R 22 2x WEIGHT DO NOT SCALE DRAWING MATERIAL DEBUR AND BREAK SHARP EDGES TH...

Страница 29: ...29 CL960 T10 16 mm 8x 3 x 12 mm 23...

Страница 30: ...30 Leveler Niveleur Adjustment Ajustement...

Страница 31: ...31 Adjustment Ajustement 9 16...

Страница 32: ...up space when anti pinch protection is activated Tests fonctionnels Des tests fonctionnels complets doivent tre effectu s apr s l installation Avant de l utiliser assurez vous que les deux cordons d...

Страница 33: ...have any questions contact your supplier Avant d utiliser l appareil Lisez le manuel d utilisation Seules les personnes autoris es peuvent utiliser ce produit Autorisation signifie obligation de lire...

Страница 34: ...34...

Страница 35: ...35...

Страница 36: ...Granberg Interior AB Box 6112 600 06 Norrk ping Tel 011 19 77 50 E mail info granberg se Internet www granberg se...

Отзывы: