background image

GRAINPRO

®

 

TRANSAFELINER™ BULK 

INSTRUCTION MANUAL 

MA4045RAD1114-5

 

 
 
 
 
 

 

 
 
 
 
 
 

 

Содержание TRANSAFELINER

Страница 1: ...GRAINPRO TRANSAFELINER BULK INSTRUCTION MANUAL MA4045RAD1114 5...

Страница 2: ...33 717 Website www grainpro com Email saleseafrica grainpro com GrainPro Mexico Cto Garona No 903 Secci n Tres Col Amberes 37237 Le n Gto Mexico Phone Mobile 52 1 477 392 0851 Website www grainpro com...

Страница 3: ...ssure Vacuum Decay Test 17 Installing the Flexible Adapter Hose for CO2 or O2 Reading 18 Using Oxygen Analyzer for Monitoring Without CO2 Flushing Optional 19 Using Carbon Dioxide Analyzer for Monitor...

Страница 4: ...le loading port Unloading of the TSL Bulk is best done by self discharging or by tilt trailer where unloading can be done by slitting the bottom portion of the TSL Bulk and tilting the shipping contai...

Страница 5: ...nsure it includes the following items PART NAME DESCRIPTION IMAGE 2 1 TSL BULK BODY 2 1 1 Ultra Hermetic Polyethylene with barrier layer 2 2 ZIPPER SLIDER 2 2 1 For zipper closing Two 2 pieces 2 3 PRE...

Страница 6: ...Decay Test or CO2 or O2 reading 1 piece 2 6 DESICCANTS 2 6 1 TSL Bulk 2 packs x 3pcs pack 2 7 BULKHEAD 2 7 1 Woven Polyethylene WPE Dimension 229cm x 246cm 2 8 INSTRUCTION MANUAL 2 8 1 Installation in...

Страница 7: ...mission Rate OTR cc m2 9 Water Vapor Transmission Rate WVTR g m2 day 4 Product Life years 2 Warranty year 1 Sealing Mechanism 2 Track PE Zipper Capacity kg lbs based on wheat 21 600 47620 Dimension Ax...

Страница 8: ...ranty year 1 Dimension DxE cm inch 229X246 90x97 5 INSTALLATION 5 1 PREPARATION 5 1 1 Workers should not wear shoes with spikes that might cause damage to the TSL 5 1 2 The TSL Bulk is designed for a...

Страница 9: ...ge the liner 5 1 5 Place a mat or thick cardboard on the floor as an additional protection for the TSL Bulk 5 1 6 Carefully unfold the TSL Bulk Lay TSL Bulk with the pre installed tape facing upward 5...

Страница 10: ...tapes aligned with container s hooks 5 1 11 Hanging of liner should be done by completing one side of the container first starting from the door then going around the ceiling of the container by foll...

Страница 11: ...f container s wall 5 2 4 Install four 4 GI pipes NOT INCLUDED in the TSL Bulk Package for support 0 4 m apart Material 1 1 2 G I Pipe Schedule 40 Size Diameter 38 mm 1 in Wall Thickness 3 68 mm 0 145...

Страница 12: ...x 1 x 1 16 cm inch F 20 7 9 G 1 2 0 5 H 1 2 0 5 I 9 5 3 7 J 1 2 0 5 K 1 2 0 5 L 0 5 0 2 5 4 4 Blower M 25 4 cm 10 in N 8 9 3 5 in Type Axial Flow Fan Rated Speed rpm 2200 2100 10 Maximum Air Flow 116...

Страница 13: ...lk loading port 5 5 4 Use screw conveyor or grain auger that can be inserted through the loading port of the TSL Bulk positioned at the upper end of the liner Use of blower is recommended for easy loa...

Страница 14: ...5 6 2 Place the GrainPro Dry Bags in perforated bags or sacks to prevent direct contact with commodity Position the Dry Bags on top of the loaded commodity 5 7 PLASTIC VALVE INSTALLATION FOR PRESSURE...

Страница 15: ...e inner side of the TSL approximately 20 cm from the zipper 5 7 4 Screw the plastic valve body The cap of the plastic valve should be positioned outside the loaded TSL Bulk 5 8 SEALING 5 8 1 Untie the...

Страница 16: ...ock 5 8 5 Two persons are required for ease in zipping the TSL Bulk a One person will do the zipping and the other person holds the other end steadily making both sections of the zipper in a straight...

Страница 17: ...ommercially available or improvised U tube manometer can be used to monitor the pressure 5 9 2 Connect the manometer hose to the flexible adapter hose previously installed in the TSL 5 9 3 Twist the p...

Страница 18: ...LING THE FLEXIBLE ADAPTER HOSE FOR CO2 OR O2 READING To ensure gas tightness the container with TSL can be checked using the CO2 analyzer or O2 analyzer 5 10 1 The flexible adapter hose is included in...

Страница 19: ...e analyzer the oxygen level can be checked through the plastic valve with flexible adapter hose before unloading Decreased oxygen level indicates absence of any source of leaks from punctures holes or...

Страница 20: ...lways keep the removable valve cover in place Never attempt to lift a cylinder by its cap the cap is intended solely to protect the valve When moving cylinders even for short distances use a cart trol...

Страница 21: ...59 27 1 Sorghum 0 72 18 5 Soybean 0 75 16 5 Sunflower 0 41 38 9 Wheat 0 77 15 2 5 14 2 CO2 application a Make sure that enough CO2 is available on site and proper pressure hose with matching TSL and C...

Страница 22: ...ll serve as an outlet for the displaced air f Open a section of the zipper to serve as outlet to discharge O2 when flushing g Flushing emptying of the cylinder depends on the amount of CO2 to be appli...

Страница 23: ...horoughly using the slider 5 14 5 For controlling stored product insects maintaining CO2 above 50 for 10 days or CO2 above 35 for 15 days is sufficient to provide complete control after which the line...

Страница 24: ...8 8 57 9 11 8 43 5 14 8 29 2 17 8 14 8 20 8 0 5 5 16 USING CARBON DIOXIDE ANALYZER FOR MONITORING WITH CO2 FLUSHING OPTIONAL 5 16 1 Recommended pest reduction timeline a Leave the TSL closed for 15 da...

Страница 25: ...Unlike the TSL the TSL Bulk is designed to easily and conveniently load bulk commodities using conveyor belt or blower It has an opening at the front to fit blower or conveyor for loading 7 3 WHAT CO...

Страница 26: ...od or catastrophes buyer s fault or negligence improper storage or installation and improper maintenance Replacement costs and shipping charges for Products found not to be under warranty as specified...

Отзывы: