GRAINPRO
®
COLLAPSIBLE DRYER CASE II™
INSTRUCTION MANUAL
MA4022JMJ0412-8
Страница 1: ...GRAINPRO COLLAPSIBLE DRYER CASE II INSTRUCTION MANUAL MA4022JMJ0412 8...
Страница 2: ...GrainPro Nigeria Ltd 6 Adu Street Aguda Ogba Ikeja Lagos Email africa grainpro com Tel 234 806 564 3156 GrainPro Mexico S de RL de CV Cto Garona No 903 Secci n Tres Col Amberes 37237 Le n Gto Mexico M...
Страница 3: ...NSTALLATION 7 Site selection 7 Preparation 7 Loading 7 Commodity thickness and mixing frequency 8 Closing the zipper 8 Preventing condensation at night 8 Unloading 9 Deflating the air tube 9 7 MAINTEN...
Страница 4: ...flap cover will prevent entry of moisture or water protecting the commodity from moisture re adsorption It is supplied with a foot pump cloth duct tape and operating manual 1 1 FEATURES 1 1 1 Enable d...
Страница 5: ...NAME DESCRIPTION IMAGE 2 1 BODY 2 1 1 With pulling straps and zipper cover 2 1 2 One 1 piece 2 2 FOOT PUMP 2 2 1 Mechanical pump for inflating PE air tube 2 2 2 One 1 unit 2 3 PNEUMATIC HOSE 2 3 1 Ex...
Страница 6: ...SPECIFICATIONS PARAMETERS CDC II 25 CDC II 44 CDC II 75 Drying Area m2 ft2 25 269 44 474 75 807 Dimension LW cm inch 915x300 360x118 1 595x300 628x118 1 325x595 522x234 Capacity bags 50kg bag 110 23lb...
Страница 7: ...CDC II unclean as this will lead to rodent s attack Refer to 7 3 6 INSTALLATION 6 1 SITE SELECTION 6 1 1 In selecting a site look for a A smooth area away from standing or running water b Open area f...
Страница 8: ...4 COMMODITY THICKNESS AND MIXING FREQUENCY 6 4 1 Commodity bed thickness This is a major parameter to be considered in sun drying especially for seeds and coffee Consult experts on recommended bed thi...
Страница 9: ...esult from day night temperature variations Condensation may take place at a minimum variance of 5 C 6 6 2 To prevent condensation in situations where the commodities should be retained in the CDC II...
Страница 10: ...e connected for pulling 7 1 2 Carefully pull the other end of the old tube The old PE tube releases while the new PE tube is re inserted inside the sidewall NOTE Air tubes are especially designed and...
Страница 11: ...urn the commodities every 30 minutes as a safe practice for optimum drying 8 2 CAN I INSTALL THE GRAINPRO COLLAPSIBLE DRYER CASE II ON A CEMENTED PAVEMENT CDC II is an alternative to cemented pavement...
Страница 12: ...s of God or catastrophes fault or negligence or improper storage installation maintenance of the Products Replacement costs and shipping charges for Products found not to be under warranty as specifie...