![Grafisk Maskinfabrik DC330mini Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/grafisk-maskinfabrik/dc330mini/dc330mini_operating-manual_2254164059.webp)
GM · CONVERTING UNIT
59
Unit
Module
Every Activity
Tools
Remarks
Converter
Die cut
8
hours
Lube the
bearer rings
Thin oil,
SAE 20
Check the filth pads. Must be
soaked in oil. Keep a oil can
near the die
Converter
Die cut
1
month
Grease the gearwheels and check the side
shims for wear / adjust the side bearings
(small side adjuster nut on the bearing
block)
Grease
(Grade:
NGLI 2 or
3).
Note some models have shims
and some adjustable side
block, not both systems in
same unit.
Use the RL14 roll lift to take
the cylinder out if needed.
Converter
Die cut
1/2
year
Grease all the bearings in the die cut
station. Side block and lower ball
bearings.
The bearings must be replaced after 4-5
years.
Grease
(Grade:
NGLI 2 or
3).
RL14 roll
lifter to
remove tool
Please note that the lower
cover of the die cut must be
removed to do this.
Converter
Knife box
1 day
Check the sharpness and pressure of the
CRUSH knifes.
Pressure must never be more than 1-2
bars. Replace the knifes if the cut is bad.
Never increase the pressure to cut with
dull knifes
Always keep spare blades
Converter
Sledge
(under die
cut)
1
week
Inspect the 2 timing belts. Must be tight
and in good condition. Look for signs of
wear on the side support ball bearings .
Always keep spare timing
belts for the sledge unit (under
die cut)
Converter
Sledge
(Under die
cut)
1
month
Grease sides very lightly (where the side
ball bearings touch the metal re-
inforcements on the side of the sledge)
Grease
NGLI 2
Too much grease will damage
the system. Only a small wipe
with a finger.
Содержание DC330mini
Страница 38: ...GM CONVERTING UNIT 38 17 General information for GM diecut station...
Страница 60: ...GM CONVERTING UNIT 60 22 Dimensions...
Страница 69: ...GM CONVERTING UNIT 69 30 Notes...