![Grady-White Advance 257 Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/grady-white/advance-257/advance-257_user-manual_2253642055.webp)
3 0 6 B
I M I N I
8–9
H
EAD
O
PERATING
I
NSTRUCTIONS
Marine Head (W/ Hand Pump) Operation
1. Open the marine head inlet seacock. This seacock is in the forward bilge and is control by
the remote seacock arm labeled “Marine Head Inlet Seacock.” It can be accessed through
the upper rigging door on the aft wall inside the console.
2. Position the wet/dry bowl selector in the wet bowl setting. Fill the toilet with water by
pumping the handle several times.
3.
Flush
the toilet by pumping the handle several more times in the wet bowl position. The
contents of the bowl are discharged into the holding tank.
4. Move the bowl selector to the dry bowl position and pump the handle until almost all of the
water is removed. Leave the toilet in the dry bowl position when not in use.
Electric Marine Head Operation
1. Open the marine head inlet seacock. This seacock is in the forward bilge and is control by
the remote seacock arm labeled “Marine Head Inlet Seacock.” It can be accessed through
the upper rigging door on the aft wall inside the console.
2.
Flush
the toilet by turning the flush control knob clockwise on the pump beside the bowl.
Turn the flush control knob counter clockwise to remove most of the water from the bowl.
The contents of the bowl are discharged into the holding tank.
Emptying Marine Head Holding Tank By Overboard Discharge
1. Open the marine head discharge seacock. This seacock is in the forward bilge and is control
by the remote seacock arm labeled “Holding Tank Discharge Seacock.” It can be accessed
through the upper rigging door on the aft wall inside the console.
2. Press the level/sleep button on the tank level monitor.
3. Press and hold the empty button for 3 seconds to activate the pump. The pump will run until
the tank is empty.
4. Close the discharge seacock.
Emptying Marine Head Holding Tank Through Deck Pump-out
1. Remove the cap from the deck pump-out fitting located on the port gunwale.
2. Connect a vacuum hose from a pump-out station to the deck fitting and run until the tank is
empty. Replace the cap on the deck pump-out fitting.
See
“Marine Head Layout” on page 8–19
for a layout diagram.
N O T I C E
Overboard discharge seacock must be secured in the closed position in accordance with the laws
in your boating area.
Содержание Advance 257
Страница 8: ...W E L C O M E 1 4 ...
Страница 28: ...P E R F O R M A N C E 4 6 ...
Страница 32: ...I N S T R U M E N T A T I O N A N D S W I T C H E S 5 4 ...