Operation
24
334513A
Calibrate Chemical Dosage
1.
Begin the process by setting the cycle rate and/or
stroke adjustment of the pump to an estimated set-
ting for a desired flow rate. See
Baseline Chemical
Dosage Settings
, page 26, for tables of cycles per
minute (CPM) and corresponding gallons per day
(GPD).
2.
Follow the instructions provided with your calibration
gauge in conjunction with the table below.
3.
Adjust the cycle rate and/or stroke adjustment
accordingly after the test is performed. Increasing
the cycle rate and/or stroke adjustment of the pump
will increase the pump flow rate, while decreasing it
will decrease the flow rate.
4.
Repeat the test procedure to verify your changes.
Repeat as necessary until the desired flow rate is
achieved.
Stroke Adjustment
Wolverine Basic
This pump has three defined stroke adjustment posi-
tions.
1.
Disconnect main power from pump.
2.
Expose the drive shaft (33) by loosening the cap
screws (27) and removing the molded guard (26).
The cap screws will remain with the molded guard.
3.
Remove the spring pin (34) from the drive shaft (33)
and stroke adjuster (35).
F
IG
. 4 Wolverine Basic stroke adjustment
34
33
35