Setup
Setup
Setup
1.
Unpack the ram
2.
Locate and Install the ram
3.
Mechanical Setup
4.
Connect hoses to electrical control panel
5.
Connect electrical control panel to power source
6.
Ground system
7.
Select ADM settings
Unpack
Unpack
Unpack
1.
Inspect the shipping box carefully for damage.
Contact the carrier promptly if there is damage.
2.
Open the box and inspect the contents carefully.
There should not be any loose or damaged parts
in the box.
3.
Compare the packing slip against all items in the
box. Report any shortages or other inspection
problems immediately.
4.
Remove the unit from the skid and place it in the
desired location. See Location
Location
Location Requirements
Requirements
Requirements.
Location
Location
Location Requirements
Requirements
Requirements
1.
Make sure there is sufficient overhead clearance
for the pump and ram when the ram is in the fully
raised position (approximately 110 in. (280 cm).)
2.
If you are installing a vent hood, make sure there
is sufficient horizontal clearance for it. Locate the
ram near a connection to the factory ventilation
system.
3.
Make sure the air regulators for the pump and
ram are fully accessible, with room to stand
directly in front of the pneumatic control panel
and the electrical control panel.
4.
When locating the system, do not install closer
than 36 in. (914 mm) to vertical surfaces.
5.
Make sure there is easy access to an appropriate
electrical power source. The National Electrical
Code requires 3 ft (0.9 m) of open space in front
of the electrical panel. Comply with all local
codes and regulations.
6.
For hydraulic rams, locate the hydraulic power
supply in an area that has:
• easy access for servicing and adjusting the
hydraulic pressure on the supply unit.
• sufficient clearance for the hydraulic lines that
attach to the pump.
• easy access to read the hydraulic fluid level
gauge.
Install
Install
Install System
System
System
Refer to
for mounting and
clearance dimensions.
Follow all
Location Requirements, page 15
, when
selecting a location for the ram.
1.
Apply 50 psi download pressure to ram.
2.
Wrap the bar with the lifting sling.
3.
Lift the system off the pallet using a crane or a
forklift and place in desired location.
4.
Level the base of the ram, using metal shims.
5.
Bolt the ram to the floor, using anchors that are
long enough to prevent the unit from tipping.
Install
Install
Install Hydraulic
Hydraulic
Hydraulic Power
Power
Power Supply
Supply
Supply
See the Ram manual for installation and dimensions.
334130D
15
Содержание Therm-O-Flow 200
Страница 48: ...Repair Figure 28 48 334130D...
Страница 56: ...Repair Figure 34 Inside of Electrical Control Enclosure 56 334130D...
Страница 59: ...Electrical Schematics 400V 400V 400V 3 3 3 Phase 50 Phase 50 Phase 50 Hz Hz Hz 334130D 59...
Страница 60: ...Electrical Schematics 400 600VV 400 600VV 400 600VV 3 3 3 Phase 60 Phase 60 Phase 60 Hz Hz Hz 60 334130D...
Страница 61: ...Electrical Schematics AWB AWB AWB and and and MZLP 1 MZLP 1 MZLP 1 334130D 61...
Страница 63: ...Electrical Schematics MZLP MZLP MZLP Zones Zones Zones 334130D 63...
Страница 67: ...Parts Electrical Electrical Electrical Module Module Module 334130D 67...
Страница 68: ...Parts 68 334130D...
Страница 94: ...Accessories and Kits 94 334130D...