Setup
10
313877G
Setup
Micrometer and LRT PD44 Only
1. Connect air supply to main air inlet on control box.
Air supply must include a shut-off/bleed valve that
bleeds pressure past the shut-off/bleed valve and
an air-water separator/filter.
2. Connect air lines from control box to dispense valve.
Match the number and color codes on the fittings
and connections. See the following table and illus-
tration.
3. Connect Dispense Valve I/O, and Start Options
logic cables. If level controls are installed, connect
Level Controls logic cables.
4. Adjust air pressure regulator to 80 psi (0.6 MPa,
6 bar).
5. Perform Setup procedure for dispense valve and
page 3.
Connection
Color
Connection
Description
Red
Extend
Blue
Retract
Yellow
Dispense
Green
Reload
7
2
5
3
4
6
1
7
2
5
3
4
6
1
7
2
5
3
4
6
1
1
2
5
6
3
7
12
9
13
10
14
11
8
4
SIGNAL CONNECTION
PG-3
A TANK
LEVEL CONTROLS
PG-4
B TANK
LEVEL CONTROLS
PG-2
CUSTOMER I/O
100V TO 250V AC
PG-8
START
MACHINE I/O
PG-1
1
3
4
2
EXT
LOAD
DISP
RET
106
VALVE
108
107
SPOOL
105
CYLINDER
AIR
7
2
5
3
4
6
1
7
2
5
3
4
6
1
7
2
5
3
4
6
1
1
2
5
6
3
7
12
9
13
10
14
11
8
4
SIGNAL CONNECTION
PG-3
A TANK
LEVEL CONTROLS
PG-4
B TANK
LEVEL CONTROLS
PG-2
CUSTOMER I/O
100V TO 250V AC
PG-8
START
MACHINE I/O
PG-1
1
3
4
2
EXT
LOAD
DISP
RET
106
VALVE
108
107
SPOOL
105
CYLINDER
AIR
NOTICE
Feed system and main logic control system must
use separate air supplies.
7
2
5
3
4
6
1
7
2
5
3
4
6
1
7
2
5
3
4
6
1
1
2
5
6
3
7
12
9
13
10
14
11
8
4
SIGNAL CONNECTION
PG-3
A TANK
LEVEL CONTROLS
PG-4
B TANK
LEVEL CONTROLS
PG-2
CUSTOMER I/O
100V TO 250V AC
PG-8
START
MACHINE I/O
PG-1
1
3
4
2
EXT
LOAD
DISP
RET
106
VALVE
108
107
SPOOL
105
CYLINDER
AIR