Setup/Startup
3A3392B Operation
11
13. Set pump switch to
ON
(pump is now active).
14. Increase pressure control enough to start pump.
Allow fluid to circulate for 15 seconds.
15. Turn pressure down, turn prime valve horizontal.
Disengage gun trigger lock.
16. Hold all guns against a grounded metal flushing pail.
Trigger guns and increase fluid pressure slowly until
pumps run smoothly.
17. Inspect fittings for leaks. If leaks occur, turn sprayer
OFF immediately. Perform
Pressure Relief Proce-
dure
. Tighten leaky fittings. Repeat
Setup/Startup
,
steps 1 - 17. If no leaks, continue to trigger gun until
system is thoroughly flushed. Proceed to step 18.
18. Place siphon tube in paint pails.
19. Trigger all guns again into a flushing fluid pail until
paint appears. Assemble tips and guards.
SwitchTip and Guard Assembly
1. Engage trigger lock. Use end of SwitchTip to press
OneSeal into tip guard, with curve matching tip
bore.
2. Insert SwitchTip in tip bore and firmly thread assem-
bly onto gun.
High-pressure spray is able to inject toxins into the
body and cause serious bodily injury. Do not stop
leaks with hand or rag.
ti23793a
15s
ti28039a
ti28040a
ti28041a
ti27613a
ti27774a
ti27775a
ti27776a
Содержание LineLazer 130HS
Страница 23: ...Notes 3A3392B Operation 23 Notes ...