Installation
4
332590A
5.
Install control box:
•
Electric Reactor only: Tilt control box (2) right and
forward then insert left of insulated tubing. Secure
with screws (7).
NOTE: If the control box does not easily slide into place,
loosening or removing the motor cover can help.
•
Hydraulic Reactor only: Use three screws (7) to
install control box (2) in location shown.
Attach Control Box Electrical Connections
6.
Find the DIN rail inside of the Reactor cabinet. See
F
IG
. 1, F
7.
Electric Reactors only, see F
IG
. 1 and F
page 5 to identify whether your system uses style 1
or style 2 of DIN rail.
NOTE: The difference between style 1 and style 2 DIN
rails is the layout of the terminal blocks on the left hand
side.
NOTE: In the following steps, ensure stripped wire ends
are fully inserted into terminal connectors.
8.
Insert green grounding wire (G) from control box
into grounding terminal block (6) supplied with kit,
then tighten screw (Y) to secure wire.
9.
Install grounding terminal block (6) onto right end of
DIN rail then tighten center screw (X) to secure in
place. See F
IG
. 1 for DIN rail style 1 or F
. 2 for DIN
rail style 2.
NOTE: The black power wires (B, C) are interchange-
able.
10. For hydraulic Reactors, loosen screws (S) then
insert black power wires (B, C) into the top of the
highlighted terminal blocks (F) shown in F
Tighten screws (S).
For electric Reactor DIN rail style 1, insert black
power wires (B, C) into the bottom of the highlighted
terminal blocks (F) shown in F
. 2. Tighten screws
(S).
For electric Reactor DIN rail style 2, loosen
screws (S) then insert black power wires (B, C) into
same slots as existing wires (Z) as shown in F
IG
. 1.
Tighten screws (S).
11. Pull on all wires (B, C, G, Z) to ensure the connec-
tions are secure. Re-install and tighten any loose
wires.
To prevent electric shock, do not pinch wires when
installing control box in the following step.
ti21801a
ti21802a