
Create
Create
Create Pump
Pump
Pump Profiles
Profiles
Profiles
Every pump installed in a station is used to constantly
circulate fluid through the paint kitchen. The pump
speed or output pressure varies, depending on
the conditions within the system or the current
operational status of the station.
For example, one profile might be set up and used
when the paint system is in production mode, where
high flow rate or pressure is needed to accommodate
one or more paint sprayers. A second profile might
be created for use when the paint system is in
non-production mode, where a low flow rate or
pressure is needed to circulate paint through the
system.
Use this procedure to create up to four profiles for
each pump. Each profile determines how a pump
performs under a set of specified conditions.
1.
Press
on any Run screen to enter the Setup
menu screen.
2.
Press Profiles
Profiles
Profiles.
3.
On the Profiles screen, press Pump
Pump
Pump.
Figure 74 Profiles Screen
4.
On the E-Flo DC Profiles screen, press the
Station
Station
Station Number
Number
Number field.
5.
On the Station
Station
Station Number
Number
Number keypad, enter the number
of the station to be configured.
The number in the field is the station that is
being configured. The station name is displayed
directly below the station number.
3A4030C
85