Installation
3A1657A
7
Calibration Kit
In order to perform the calibration procedure the HFR
system must have circulation lines going from the sys-
tem fluid manifold back to the tanks. If the system does
not have circulation lines, a calibration kit must be pur-
chased and installed. See
on page 17 for the cor-
rect calibration kit number to order for your dispense
valve.
This procedure applies to the L-Head, S-Head and
GX-16 calibration kits only. See page 17 for part refer-
ence numbers.
1.
Perform HFR
Pressure Relief Procedure
. See
HFR operation manual for detailed instructions.
2.
Perform dispense valve
Pressure Relief Proce-
dure
. See dispense valve manual, page 2, for
detailed instructions.
3.
Verify all air, hydraulic, and material pressures have
been relieved before continuing.
4.
Perform HFR
Shutdown
procedure. See HFR oper-
ation manual for detailed instructions.
5.
If material hoses from the dispense valve are con-
nected to the HFR system, disconnect them from
the system fluid manifold to enable removing the
blue pumpline shield.
6.
Remove blue plastic shield that covers the center of
the pumpline.
7.
Remove A (Red) and B (Blue) circulation fittings
from the fluid manifold. See F
IG
. 9. Clean the fittings
then set them aside. They will not be needed.
8.
Install fittings (ref. 3) from this kit in place of the cir-
culation fittings. See F
IG
. 11.
9.
De-pressurize and empty the material tank.
10. Remove material return line from tank.
11. Assemble fittings and hose then connect assembled
kit to the return port of the tank as shown in F
F
IG
. 9: Remove Circulation Fittings
F
IG
. 10: Install Fittings and Hose
ti17018a
ti17019a