background image

7

307-922

STARTUP

Pressure Relief Procedure

To reduce the risk of serious bodily injury, including

injury from moving parts, or electric shock, always

follow this procedure whenever you shut off the sys-

tem, when checking or servicing any part of the sys-

tem and whenever you stop dispensing.

1. Turn the ON/OFF switch to OFF.
2. Unplug the power supply cord.
3. Trigger the spray valve to relieve pressure.
If you suspect that pressure is not fully relieved after

following the steps above, open the priming valve 2

turns counterclockwise.

 

WARNING

1. Place the suction hose in the pail of material.

2. Plug in the sprayer.

3. Open the priming valve 2 turns 

counterclockwise.

4. Turn the ON/OFF switch ON.

5. You can see the material  being drawn into the suc-

tion hose (if the hose is clean). As soon as you see

material flow through the priming tube, close the

priming valve. This usually takes less than 30 sec-

onds.

 

CAUTION

Failure to completely close the priming valve after

the system is primed will cause the valve to erode,

greatly shortening the valve life.

NOTE: If your system is hard to prime, first try to force

feed the suction tube. Hold the suction tube in a

vertical position and pour material into it. Turn on

the system. If the system does not prime within

one minute, shut it off. Heavy viscosity material

may need to be thinned. Be sure to follow the

material manufacturer ’s recommendations  on

thinning.

6. Trigger the spray valve to prime the outlet hose and

extension. Once primed, the motor will run when

there is material demand, but appears to shut itself

off when there is no material demand.

NOTE: An occasional start and stop of the motor when

the spray valve is not triggered is normal.

OPERATION

 

WARNING

To reduce the risk of electric shock, do not expose

the system to rain. Always store the system indoors.

Do not operate the pump with the base cover

removed.

 

CAUTION

Always allow cold equipment to warm to room tem-

perature before using it to prevent damaging the

system.

1. With the system fully primed, trigger the spray valve

briefly until an even flow of material is spraying out

of the tip.

2. Hold the spray tip approximately 12 in. (300 mm)

from the surface and start spraying.

3.

For low pressure spraying,  use the 431 size tip

supplied with the wand. This tip develops a spray pat-

tern at a very low pressure when spraying fluids

about the viscosity of water, such as wetting agents,

penetrating encapsulants and lockdowns.

4.

For fine-finish spraying,  use the fine-finish tip

which produces a fine mist for “glove bag” applica-

tions.

5. When you ARE DONE spraying, turn the ON/OFF

switch to OFF and trigger the spray valve.

6. Thoroughly flush the system immediately after each

use to keep it in good working order. See page 8.

Содержание 222-340

Страница 1: ...ration 7 Maintenance Flushing 8 Roller Cover 9 Troubleshooting Chart 10 Repair Roller Valve 11 Fuse 12 ON OFF Switch 12 Rectifier 12 Power Supply Cord 12 Pressure Switch 13 Outlet Valve 13 Inlet Valve...

Страница 2: ...static sparking Read and follow the grounding instructions on page 6 of this manual EQUIPMENT MISUSE HAZARD This system is designed to be used at 250 psi 17 5 bar MAXIMUM WORKING PRESSURE Use only com...

Страница 3: ...ltant des tincelles d lectricit statique Lisez et observez les instuctions de mise la terre la page 6 de ce manuel DANGERS POUVANT RESULTER DU MAUVAIS USAGES DE L EQUIPMENT Ce syst me est con u pour t...

Страница 4: ...oque el ctrico u otras lesiones corporales graves debido a chispas est ticas Leer y seguir las instrucciones dadas en la p gina 6 de este manual PELIGRO POR MAL USO DEL EQUIPO Este sistema est dise ad...

Страница 5: ...ming valve counterclockwise causes the material to drain directly back into the pail through the priming tube T urning the knob clockwise causes the to flow through the fluid outlet valve and to the h...

Страница 6: ...the power supply cord Be sure the outlet is properly grounded In the event of an electrical short circuit grounding reduces the risk of an electric shock by providing an escape wire for the electric c...

Страница 7: ...ute shut it off Heavy viscosity material may need to be thinned Be sure to follow the material manufacturer s recommendations on thinning 6 Trigger the spray valve to prime the outlet hose and extensi...

Страница 8: ...e material is drained This avoids contaminating the material with the flushing water 3 Now hold the spray wand over the flushing pail Turn on the pump and trigger the spray valve Circulate the solutio...

Страница 9: ...9 307 922 NOTES...

Страница 10: ...and try to prime sys tem If it doesn t prime in one minute replace the out let spring See Outlet Valve page 14 Inlet valve stuck or damaged Depress valve gently and pour in about 1 teaspoon mineral s...

Страница 11: ...the assem bly tool M and press the lips of the packing over the end of the tool See Fig 6 10 Guide the tool M into the fluid housing D until the needle protrudes through the bottom of the housing Lig...

Страница 12: ...e terminal ON OFF Switch See Fig 8 and 9 1 Disconnect the two leads from the ON OFF switch 34 terminals See Fig 9 2 Remove the boot 36 and pull the switch 34 out of the base Remove the ground wire 84...

Страница 13: ...oroughly clean and dry all parts 6 Tip the pump back Install a new seal 2f making sure it lays flat 7 Install the seat 2e and torque it to 80 100 in lb 13 5 16 N m 8 Drop in the ball 2d making sure it...

Страница 14: ...otor shaft D to be sure it turns freely 9 Reinstall the front cover 23 Priming Valve Tube See Fig 13 NOTE Each new priming valve kit includes a priming tube and fittings 1 Unscrew the nut on the handl...

Страница 15: ...again CAUTION Spinning the motor shaft while assembling the pump ensures that parts are properly aligned If they are not and you start the pump serious damage could result to the motor bearing and co...

Страница 16: ...CATE TORQUE TO 85 in lb 9 6 N m SEE DETAIL A page 17 PRESS FIT INTO 22 34 68 67 28 43 33 33 39 25 26 69 36 30 32 44 47 45 46 15 16 22 11 17 48 49 27 21 20 18 23 24 29 LABEL 96 LABEL 0301 52 54 LABEL 4...

Страница 17: ...rod Always order two of Ref No 27 when replacing housing 1 23 181 166 COVER front 1 24 108 236 SCREW mach filh No 8 32 x 0 312 4 25 102 313 CAPSCREW hex head 1 4 20 x 1 75 2 26 100 028 LOCKWASHER int...

Страница 18: ...ng 2 85 108 228 NIPPLE 3 8 npt 1 87 108 408 ADAPTER 1 88 220 237 WAND tube 1 REF NO PART NO DESCRIPTION QTY 89 186 334 ADAPTER tip 1 90 171 602 WASHER tip 1 91 185 559 431 SPRAY TIP 0 031 orifice 1 92...

Страница 19: ...e than 25 ft 7 6 m of outlet hose Not intended for use with lacquer or lacquer thinners 220 009 Outlet Hose 3 8 ID cpld 3 8 npsm fbe 50 15 m FIXED EXTENSION TUBES Included with sprayer 12 in 0 31 m lo...

Страница 20: ...ment of structures accessories equipment or materials not supplied by Graco or the improper design manufacture installation operation or maintenance of structures accessories equipment or materials no...

Отзывы: