Starting a New Job (or Refilling the Material Cup)
3A2853C
11
Starting a New Job
(or Refilling the Material Cup)
1.
Engage trigger lock and put prime/spray valve UP to
release pressure.
2.
Install material cup liner, fill with material, and
thread onto sprayer.
3.
To fill sprayer with fluid, disengage trigger lock and
trigger sprayer for 10 seconds. Then release trigger
and put prime/spray valve DOWN to spray position.
4.
Reverse spray tip to UNCLOG position, pull trigger
and release.
5.
Put prime/spray valve UP to release pressure. Then
rotate spray tip back to spray position.
NOTE:
Failure to perform this operation could result
in poor spray pattern.
If sprayer fails to prime, try one of the steps
below:
1.
Use the Pump Armor storage/startup tool to clean
the inlet valve fitting. See
Storage
, page 17.
2.
Clean air vent holes or the air vent valve,
depending on model. See
Shutdown and Clean
ing
, page 15. Remove air vent valve, clean, and
reinstall.
ti14999a
ti14994a
ti16700a
ti18866a
ti15474a
ti18868a
ti15418a
ti15425a
ti14995a
ti16701a
ti16716a
ti18874a
ti14991a
ti14985a
ti14991a
ti16713a
ti16700a
ti16992a
ti18876a
Содержание 16N664
Страница 33: ...Notes 3A2853C 33 Notes...