Pressure Relief Procedure
3A0261K
33
Pressure Relief
Procedure
1.
T
urn main air supply shut-off/bleed valve to the off
position. This will bleed air from the system.
2. Perform feed system pressure relief procedure. See
3. Perform dispense valve pressure relief procedure.
Shutdown
1. Go to the Metering Valve Control screen.
2. Press the Retract button.
3. Press the Extend button.
4. Press the Emergency Stop button. Ensure every-
thing is off.
5. Twist Emergency Stop to reset.
7. Perform feed system shutdown procedure. See
on page 3.
8. Perform dispense valve shutdown procedure. See
on page 3.