1.
Viewing through the clear housing faceplate, confirm the electrical wires are routed through the appropriate
conduit and the conduit is secured to the GPS-DM48-AC main housing
2.
Confirm the electrical connections are routed and wired in accordance with the installation manual
3.
Confirm the electrical wires are secured by the strain relief within the main housing and the terminal
connections are also secure
4.
Confirm the electrical supply is terminated in an appropriate fashion at the supply end and all local
and national electrical and building codes are complied with
5.
Use a soft cloth with isopropyl alcohol to wipe debris off the GPS-DM48-AC emitters
6.
Allow any residual alcohol to evaporate off the emitters
prior to turning the ionizer on for the first time
ELECTRICAL INSTALLATION
STARTUP
UNIT STARTUP
1.
Power on the GPS-DM48-AC
2.
Confirm the GPS-DM48-AC is continuously powered and not configured to cycle with the HVAC duty
3.
Once powered on, confirm the green power LED is illuminated
4.
Confirm that the cleaning cycle frequency is set to 1 day as detailed in the IOM
5.
Confirm the clear faceplate is reattached and secured by the four provided fasteners
6.
Measure the voltage at the GPS-DM48-AC emitters (both polarities) and confirm it is above the minimum
target level of 3kV
7.
Visually confirm there is no du
s
t or dirt on the carbon fiber emitters after they were cleaned with isopropyl
alcohol during installation
8.
With the GPS-DM48-AC operational, verify ion density output. Confirm it meets the combined polarity target
of 200M ions/cc using the AIC2 ion meter ions/cc for each polarity measured 1” away with air handler
fan off (no airflow)
9.
Confirm the
final configuration
is securely attached to the duct wall