1. Record Manufacturer: GPS
2. Record Model Number: GPS-DM48-AC
3. Record Serial Number of Ionizer:
EQU INSTALLER DATA
Start-up
Checklist
™
Complete 1 Checklist Per Ionizer
MODEL VERIFICATION
INSTALLATION DATA
5.
Record Name of Install Company and Technician:
6.
Record Date of Installation/Startup:
7.
Record ID
of nearest HVAC system component
:
8.
Record Incoming Power Level:
9.
Record Voltage Output at GPS-DM48-AC Emitters:
MECHANICAL MOUNT | Standard Installation
INSTALLATION
1. Confirm the GPS-DM48-AC is installed downstream of all filters in the system
2. Confirm a 4” hole was cut into the wall where the product is installed
3. Confirm there was at least 8” clearance into the duct to allow clearance of the emitters
4. Confirm that the air in the duct flows directly between the emitters as indicated by the sticker on the
ionizer body. (Note, the level orientation of the unit face should not be used as an alignment method as it is
rotationally offset).
5. Confirm the minimum of 4 fasteners have been used to secure the unit using the tabs on the ionizer body
GPS Air