background image

Attachments 

6 Chamber ankle sleeve 

6 Chamber full arm sleeve 

30” 6 Chamber full leg sleeve 

35” 6 Chamber full leg sleeve 

15”  6 Chamber straight knee sleeve 

19”  6 Chamber straight knee sleeve 

Page 1 

Содержание AN-SD-0005

Страница 1: ...Sleeve Instruction Manual www gpe rd com service gpe rd com GPE Sequential Compression Sleeve ...

Страница 2: ...Attachments 6 Chamber ankle sleeve 6 Chamber full arm sleeve 30 6 Chamber full leg sleeve 35 6 Chamber full leg sleeve 15 6 Chamber straight knee sleeve 19 6 Chamber straight knee sleeve Page 1 ...

Страница 3: ...ot FL 35 0001 35 2 6 Chamber full leg boot FL 30 0002 30 3 6 Chamber full arm boot FA 27 0003 34 x27 4 6 Chamber ankle boot AN SD 0005 22 x 17 5 6 Chamber large straight knee wrap ST 29 0006 28 5 18 5 6 6 Chamber straight knee wrap ST 19 0007 19 15 Page 1 1 ...

Страница 4: ... hold it For the arm sleeve wrap the Velcro strap under the armpit of the opposite arm and secure It may be necessary to unfasten the sleeves first by unzipping or pulling apart the Velcro before wearing 4 Before and after using the sleeves wipe the inside and outside with a 70 alcohol solution It may be necessary to unzip the sleeves to do this Afterwards dry with a dry cloth Sleeves are not mach...

Страница 5: ...it Connect the male and female water line connectors Make sure the clamps are secure and the O ring is present on the male connector Attach the air line connectors and water line connectors to the desired sleeve s If using two sleeves then the splitter must be used Page 3 ...

Страница 6: ...Wearing the ankle sleeve Step 2 Step 1 Step 3 Connect the water and air lines before wearing the sleeve Page 4 ...

Страница 7: ...Step 1 Step 3 Step 2 Step 4 Wearing the universal sleeve Connect the water and air lines before wearing the sleeve Page 5 ...

Страница 8: ...Step 1 Step 3 Step 2 Step 4 Wearing the straight knee sleeve Connect the water and air lines before wearing the sleeve Page 6 ...

Страница 9: ...Step 1 Step 3 Step 2 Step 5 Wearing the arm sleeve can be worn on either side Step 4 Connect the water and air lines before wearing the sleeve Page 7 ...

Страница 10: ...Wearing the full leg sleeve Step 2 Step 1 Step 3 Connect the water and air lines before wearing the sleeve Page 8 ...

Страница 11: ...e labor charges incurred by GPE LLC in repairing or replacing the defective parts during the Warranty Period from the date of your purchase c GPE LLC also warrants that the repaired or replaced parts will be free from defects in material and workmanship for a period of FIFTEEN 15 days from the date of repair or replacement or for the remainder of the Warranty Period whichever is greater 5 GPE LLC ...

Страница 12: ...Global Parts Enterprise LLC 1350 E Arapaho Rd Suite 116 Richardson TX 75081 https gpr rd com service gpe rd com 972 807 9516 www gpe rd com ...

Отзывы: