
1: MAKE SURE THAT THE T-NUTS FROM STEP #1 ARE INSTALLED IN THE HOLES AT 95-1/2" ON THE
MIDDLE CORNER POSTS.
2: PLACE THE RIGHT HAND CORNER LAG POST ON TOP OF THE BACK PANEL BOARD ON THE
SWING BEAM SIDE OF THE FORT AND THE LEFT HAND CORNER LAG POST ON THE OPPOSITE SIDE
OF THE FORT. MAKE SURE THE CORNER LAG POSTS ARE FLUSH TO THE CORNER POSTS AND
ATTACH WITH 3/8 X 5" LAG SCREWS AND 3/8" WASHERS AS SHOWN BELOW.
3: MEASURE DOWN FROM THE TOP OF THE CENTER POST 6-3/4" AND MARK THIS POINT. THE
BOTTOM OF THE CENTER LAG POST WILL ALIGN WITH THIS POINT. INSTALL THE POST WITH 3/8 X 5"
LAG SCREWS AND 3/8" WASHERS.
STEP 18: LAG POSTS
LEFT SIDE LAG POST
4 X 4 X 61-1/2"
3/8" WASHER
(5 HOLES)
LAG SCREW
3/8 X 5"
(7 HOLES)
RIGHT SIDE LAG POST
4 X 4 X 61-1/2"
4 X 4 X 37"
CENTER LAG POST
(2 HOLES)
6 34 "
Содержание Hideaway
Страница 26: ...1 1 W CHAINS TUBE SLIDE 10 WAVE RAD RIDE SLIDE SWINGS 2 TRAPEZE BAR W CHAINS 1 PICTURE DESCRIPTION QTY ...
Страница 28: ...DESCRIPTION PICTURE QTY 1 1 SWING SWING TELESCOPE HANGERS IRON DUCTILE GLIDER 6 ...
Страница 29: ...BRACKET GREEN HANDLES 4 10 ROPE 2 1 1 2 X 1 1 2 SAFETY 1 6 SPRING CLIP PICTURE DESCRIPTION QTY ...
Страница 30: ...PICTURE DESCRIPTION QTY TIC TAC TOE PANEL 1 2 1 UNASSEMBLED CHIMNEY UNASSEMBLED DORMER ...