
5
" WASHER
BOARD
16
TARP SUPPORT
2 X 4 X 83"
4
1
2
" HEX BOLT
STEP 6: ATTACHING TARP SUPPORT BOARDS
1: THE 2 X 4 X 83" TARP SUPPORT BOARDS (WITH THREE PRE-DRILLED HOLES) ATTACH TO THE TOP OF THE FRONT
AND REAR CORNER POSTS WITH 4
1
2
" HEX BOLTS AND
5
16
" WASHERS.
2: OFFSET HOLES SHOULD BE POINTED DOWN ON BOTH BOARDS.
3: THE SHORTEST END FROM THE COUNTER-SUNK HOLES WILL POINT TOWARD THE SWING BEAM SIDE OF THE FORT.