
STEP 22: IRON DUCTILE SWING HANGERS
1: LINE UP THE HOLES OF THE IRON DUCTILE SWING HANGERS WITH THE HOLES IN THE SWING BEAM. IF YOUR BEAM
IS BOWED SLIGHTLY PLACE THE BOW SIDE UP; THE SWING HANGERS WILL BE ON THE BOTTOM.
2: FASTEN EACH SWING HANGER TO THE SWING BEAM USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS, AND
3/8" WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
L
BOLT CAPS
7" CARRIAGE BOLT
TORQUE WASHER
3/8" WASHER
3/8" LOCK NUT
IRON DUCTILE
SWING HANGER
56
Содержание Chateau Sierra Treehouse 1500AWFD
Страница 7: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 37: ...1 1 PICTURE DESCRIPTION QTY IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0001 ROCK WALL 10 ROPE 6 28...
Страница 38: ...90 GREEN BRACKET 11 5013 SPRING CLIP 11 4003 4 6 SAFETY HANDLES PAIR 07 0005 1PR PICTURE DESCRIPTION QTY 29...
Страница 39: ...PICTURE DESCRIPTION QTY 2 UNASSEMBLED DORMER 1529 BOX 1 UNASSEMBLED CHIMNEY 1529 BOX FLAG KIT 09 1014 2 30...
Страница 93: ...APPENDIX 84...