STEP 7 - FINAL STEPS

7.1 

  Check to make sure all bolts are tight and lock washers are compressed.

7.2

  If necessary, touch up crane with paint provided.

7.3

  Keep Packing List, Installation Manual, General Arrangement Drawing, and any other

 

inserts filed together in a safe place.

 TIP: 

 Do not throw away this manual:  maintenance schedule is on back cover.

16

9/18

Содержание Free Standing PIVOT PRO

Страница 1: ...ANT DO NOT DESTROY Installation Operation Maintenance Manual Month Year Gorbel Dealer Date PIVOT PRO Articulating Jib Crane Gorbel Customer Order No Serial No Wall Mounted PIVOT PRO Free Standing PIVO...

Страница 2: ...lation 6 7 Step 3 PIVOT PRO Free Standing Mast Installation 8 9 Step 4 PIVOT PRO Free Standing Boom Installation 10 11 Step 5 Vacuum Hose Installation 12 Step 6 Accessories Optional Installation 13 15...

Страница 3: ...standard fabrication practices should be employed to assemble these cranes because of the necessity of properly interpreting these instructions Gorbel is not responsible for the quality of work mansh...

Страница 4: ...ve action taken Operating Suggestions One measure of a good crane operator is the smoothness of the crane operation The good crane operator should know and follow these proven suggestions for safe eff...

Страница 5: ...well as time and money DON TS HOISTS VACUUM LIFTERS 1 Never lift or transport a load until all personnel are clear and do not transport the load over personnel 2 Do not allow any unqualified personne...

Страница 6: ...hardware box General Arrangement Drawing can be found inserted in this installation manual WARNING Consult a qualified structural engineer to determine that your support structure is adequate to suppo...

Страница 7: ...O FS 50 12 12 T PPRO FS 50 12 12 B 916 75 10 8 PPRO FS 75 10 8 T PPRO FS 75 10 8 B 668 10 PPRO FS 75 10 10 T PPRO FS 75 10 10 B 897 12 PPRO FS 75 10 12 T PPRO FS 75 10 12 B 1142 12 8 PPRO FS 75 12 8 T...

Страница 8: ...re 2 5 Clean pivot pins with clean dry cloth Slide bearings on pivot pins Be sure to orient bearings correctly diagram 2C 2 6 Lift boom weldment up and insert lower pivot pin into lower pivot mounting...

Страница 9: ...nment 2 11 Attach two brake pads to the lower pivot mounting assembly using two 1 4 socket head cap screws lock washers and lock nuts diagram 2F 2 12 Adjust brake by tightening two lock nuts to achiev...

Страница 10: ...acks or seams in a 48 square area around center of mast Note Chemical epoxy anchor bolts are recommended because of their ability to withstand the vibrating loads caused by the rapid raising or loweri...

Страница 11: ...st plate approximately where cam followers will contact mast pipe distance between plumb line and face of mast should also be three 3 inches F Repeat steps D E every 60 around the mast to ensure that...

Страница 12: ...in hole is slightly offset This collar may be installed in one of two ways flipped to act as a 0 025 thick shim When properly shimmed the holes on safety collar and pivot pin will be aligned Using ham...

Страница 13: ...g for 45 adjustment increments Two rotation limits are supplied with the Free Standing PIVOT PRO A Swing boom to maximum rotation in one direction B Back off boom rotation until first available hole i...

Страница 14: ...Install fittings into 2 NPT couplings of boom Do NOT over tighten PVC fittings should not be tightened more than 2 turns past finger tight 5 4 Place hose clamp over hose end push hose end over barbed...

Страница 15: ...MUST BE supported by all four adjustable feet and NOT by the fork pockets Tighten jam top nut D Secure boom or assemble mast to base prior to boom assembly E Lower mast onto protruding bolts of base...

Страница 16: ...ientation The filter bracket can be mounted vertically or horizontally depending on the filter s bolt hole locations A Transfer filter mounting pattern to the filter bracket B Drill filter bracket for...

Страница 17: ...6 18 x 3 4 long hex head cap screw Tighten to 15 ft lbs C Position your lifter tube controls onto the smart hook 6 5 INSTALLING ROTATION STOPS ON WALL MOUNTED PIVOT PRO diagram 6E Contact Gorbel Custo...

Страница 18: ...hers are compressed 7 2 If necessary touch up crane with paint provided 7 3 Keep Packing List Installation Manual General Arrangement Drawing and any other inserts filed together in a safe place TIP D...

Страница 19: ...TOR NOT AN AGENT Gorbel and Purchaser agree that Purchaser has been put on notice that dealer or distributor is not Gorbel s agent in any respect for any reason Gorbel and Purchaser also agree that Pu...

Страница 20: ...and square washer are properly installed so that boom cannot dislodge Every 2000 hours or yearly 5 Rotation Limits Check for deformation Make sure that bolt is tightened Replace block if deformed Eve...

Отзывы: