Goodwe SCB2000 Скачать руководство пользователя страница 8

1.When the configuration is complete, unplug the network cable to the Ethernet port of the computer and 
plug it into the router.At the same time can restore the computer's lP address and other parameters to the 
default Settings. lf the user wants to restore to dynamic lP mode, please press the RELOAD button for about 
4 seconds. EzLogger Pro's LED lights will flash from left to right and reset to restart. EzLogger Pro will be 
switched to dynamic IP mode after restart.
2.Protocol selection
Users can choose the protocol according to their needs. The gray one is the current protocol.After the 
protocol is switched,promate waits about one minute before proceeding.
Note: if the protocol is switched, the inverter device should be restarted.

Connect the fiber jumper or tail fiber from the end boxes at both ends of the fiber to the ports of the gigabit 
fiber switches (or the gigabit fiber interfaces of the transceiver or router at one end), Note that both ends of 
the same optical fiber must be connected to the TX and RX ports of the optical fiber interfaces at both ends, 
otherwise the optical fiber cannot be connected, and the single fiber module only needs one core optical 
fiber jumper.
Note:when optical fiber group ring network, there must be only one root node in one ring network, and the 
others are slave node devices.

lf the choice of fiber version please refer to this description

Some parameters of fiber optic switch: fiber optic switch is single-mode single-fiber,fiber interface SC, 
central wavelength 1310/1550nm;The transmission distance is 20KM

4.3 Optical fiber switch configuration instructions

4.3.1 Use steps of optical fiber switch

4.3.2 The gigabit network switch indicator lights are all defined as follows

4.3.3 Reset and restore factory equipment

4.3.4 Introduction to the use of the Ring Network

PWR
RUN
FXL1
FXL2

1000M

ACT

Power indicator

System operation indicator

FXL1 Light mouth indicator light
FXL2 Light mouth indicator light

Network light
Network light

The lights indicate the power supply is normal

Slow Flash:The system is running well, flash, and the loop function is enabled

Light: light port connection normal light Flash: light port has data communication
Light: light port connection normal light Flash: light port has data communication

Lights: expressed as a rate of 1000M

Flashlight: data transmission

Long press RESET, RUN light Long bright, and then flash, quick. Grow after flashing, open RESET key, wait for RUN 
indicatorRestore to factory default when flashing slowly

(1) Login system default lP: 11.11.11.254 User name: root password: admin
Conmect th opicalfiher to the computer through the network cable. Set the lPaddress of the computer to 11.11.11.xxx 
and enterthe URL 11.11.11.254 in the browser.
Login screen appears.

账户

(User name)

Click the " OK" button

(3) Pop up the following interface. Select second root nodes of ring network

Select the second"Ring root node"

when the input is complete.

Ring network configuration

root

确定

Please click "OK" button

to complete the last step

确定

环网设置

环网设置

密码

(password) admin

环网根节点
未定义功能
环网根节点
环网从节点
快速生成树

This feature is not defined
Ring root node
Ring network slave node
Rapid spanning tree

11

12

Содержание SCB2000

Страница 1: ...GoodWe Technologies Co Ltd No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com V3 0 2022 01 25 SCB2000 User Manual Solar Communication Box Local Contacts 340 00710 00...

Страница 2: ...and Warning 3 Mounting 4 System is running 5 Maintenance and troubleshooting 6 Technical Data 7 Relevant Certi cation 3 1 Mounting Instruction 3 2 Overview and Packaging 3 3 SCB Installation 01 01 02...

Страница 3: ...ld not touch any of the electrical parts of SCB2000 like internal components cables to avoid electic shock All electrical installations must comply with local electrical standards and obtain permissio...

Страница 4: ...Refer to Figure 3 3 1 1 To allow dissipation of heat and for convenience of dismantling clearances around the SCB2000 must be no less than the values refer to figure3 3 1 2 1 Drill holes on the wall...

Страница 5: ...30mm PElineabout50mm About6 8mm 5 6mmforPE Recommend 2 5 4mm2 No more than 25 mm Content A B C D No Description Wire diameter Crosssectionalareaofcopperwire Wire length Length of bare copper wire 45mm...

Страница 6: ...lights went out The blue lights Blue lights flashing One second on one second off Blue lights flashing One second on three seconds off The blue lights went out The blue lights The blue lights went ou...

Страница 7: ...can modify the network lP address of EzLoggerPro and SCB2000 configure the number of connected inverters time setting RCR DRED function configuration and on site debugging First the user need to inst...

Страница 8: ...e mode single fiber fiber interface SC central wavelength 1310 1550nm The transmission distance is 20KM 4 3 Optical ber switch con guration instructions 4 3 1 Use steps of optical ber switch 4 3 2 The...

Страница 9: ...pply has been disconnected before the operation 5 Maintenance and troubleshooting Typical fault The serial number System failure possible cause proposal The system is not powered on The inverter devic...

Страница 10: ...ber9 9kg IP65 Wall mounting bracket mounting pole mounting 20 60 C 30 70 C 0 100 4000m Model Name Power adapter voltage input Voltage Range of lnput AC line Rated Power Consumption communication Max q...

Отзывы: