Startup sequence
1. Turn the circuit breaker on the AC side to the "ON" position;
2. Turn the DC switch of the inverter to the "ON" position.
Shutdown sequence
1. Turn the circuit breaker on the AC side to the "OFF" position;
2. Turn the DC switch of the inverter to the "OFF" position.

8.3 Electrical Connection Check

1. Check whether the cable connection is loose;
2. Check whether the grounding cable is reliably grounded;
3. Check whether the waterproof covers for RS485, WiFi and other ports are sealed correctly.
Note: The maintenance cycle is once every six months.

If the startup and shutdown sequences given above are not followed strictly, the 

inverter may be damaged.

33

34

Содержание Grid-Tie HT Series

Страница 1: ...Business Park Sector 30A Opp Sanpada Railway Stn Vashi Navi Mumbai 400703 T 91 0 2249746788 sales goodwe com service in goodwe com GOODWE Italy Via Cesare Braico 61 72100 Brindisi Italy T 39 338 879 38 81 39 831 162 35 52 valter pische goodwe com sales operazioni topsenergy com goodwe arsimp it service GOODWE Turkey Adalet Mah Megapol Tower K 9 No 110 Bayraklı Izmir T 90 232 935 68 18 info goodwe ...

Страница 2: ...n 07 4 3 Inverter Installation 08 4 4 Electrical Installation 10 4 5 Communication Installation 17 5 Operating Instructions 20 5 1 Indicator Description 20 5 2 Description of Display Screen and Buttons 21 5 3 Failure Information 25 6 Frequently Asked Questions 26 7 Technical Parameters 28 7 1 Product Specifications 28 7 2 Schematic Diagram of Main Circuit 30 8 Maintenance 31 8 1 Clean Fan 31 8 2 DC...

Страница 3: ... must be taken Without authorization do not remove the upper cover and do not touch or replace other components except the wiring terminals otherwise GOODWE will not be responsible for any personal injury or damage to the inverter Ensure that the DC input voltage is less than the maximum input voltage of the inverter otherwise the inverter will be damaged GOODWE will not be responsible for this da...

Страница 4: ...Utility grid Notes Monocrystalline silicon polycrystalline silicon thin film PV modules without grounding HT series Electric meter cabinet and distributed power generation system Different models of TN S TN C TN C S TT IT are applicable to the following grid structures If an isolation transformer is not used on the output side of the inverter to connect to the power grid neither the PV nor the PV in...

Страница 5: ...d wire to ground the inverter Used to operate and configure the inverter Used to view the inverter operating parameters Used to safely disconnect the DC input as required When the input and output meet the requirements the inverter will run automatically Turning the DC switch to the OFF position will immediately cut off the DC input You need to turn the DC switch to the ON position before starting t...

Страница 6: ...erter must be installed away from flammable and explosive materials The inverter must be installed in a place with high signal strength to ensure that there is no strong electromagnetic interference or obstructions locally The parameter labels and warning signs must be clearly visible after the inverter is installed The installation location of the inverter shall avoid sunlight rain and snow Avoid ...

Страница 7: ... Use copper terminals for copper wires and copper aluminium terminals for aluminium wires Aluminium terminals cannot be used directly Step 1 Select a suitable AC cable and strip the wire For specific specifications refer to the table below Code A1 A2 D S SPE Description Wire Length Wire Length Conductor Length Cross Sectional Area of Conductor Cross Sectional Area of Conductor Value Approximately 50...

Страница 8: ...ass the AC cord through the waterproof silicone ring Note To ensure the machine is airtight adjust the aperture of the waterproof silicone ring to match the wire diameter The diagram above shows the connection method of the multi core wire The diagram above shows the connection method of single core four wire Step 5 Tighten the screws install the fireproof mud and finally put on the cover The diagra...

Страница 9: ...EVALAN series MC4 series AMPHENOL series QC4 10 series Step 1 Select a suitable DC cable and strip the wire For specific specifications refer to the table below Code A B C Description Wireouterdiameter Cross sectionalareaofconductor Barewirelength Value 5 5 9mm 4 6mm2 Approximately7mm Follow the steps below to complete the DC cable connection A B C Step 2 Take the DC terminal from the accessory pack...

Страница 10: ...Insert the stripped wire into the terminal and then crimp it with pliers No A B C D Name Ground terminal Yellow green line Cross sectional area Wire length Description M8 L1 1 2mm B D C A Crimp Step 3 To improve the corrosion resistance of the ground terminal after the grounding cable is installed it is recommended to apply silica gel to the terminal as anti corrosion treatment Use a heat gun to t...

Страница 11: ...This function is only applicable to RS485 models The RS485 port of the inverter is used to connect to the data collector and the total length of the connecting cable must not exceed 1000m The communication cable must be separated from other power lines to avoid communication interference The RS485 wiring method is shown in the diagram Inverter RS485 RS485 LAN Ezlogger Pro RS485 RS485 Router Intern...

Страница 12: ...iring methods Unlocking tool Hold down the unlocking tool Pull out the module To remove the module the operator needs to use the unlocking tool supplied The module will be damaged if this tool is not used 4 5 4 Cloud Monitoring After the communication configuration is completed scan the QR code on the back of this manual or visit www sems com cn Download the goodwe cloudview APP and complete the re...

Страница 13: ...ndicates that the inverter is self checking and preparing to generate electricity Display of grid tie power generation power XXXXX watts means that the inverter is in power generation state when an abnormal state occurs in the system an error message will be displayed For details refer to the 5 3 Failure Information table The operating parameters of the system can be switched and displayed in the ...

Страница 14: ...chine will automat ically return to the state display menu of the first level menu Time setting Short press the button once to enter the system time setting menu which is used to set the current time of the machine and enter the second level menu by long pressing the button for 2 seconds 2000 00 00 00 00 the first and second digits remain unchanged by default The third and fourth digits are used to ...

Страница 15: ...et power limit XX First level menu Grid tie power generation Power XXXXXwatts Short press Short press Short press Short press Short press Short press Short press Short press Short press Short press Short press Daily power generation 0 0kWh Total power generation 0 0kWh Input voltage 0 0 0 0 0 0 0 0 V Input Current 0 0 0 0 0 0 0 0A Utility voltage 230 230 230 volts Output current A 0 0 0 0 0 0 Util...

Страница 16: ...tor measure the voltage between the live wire and the neutral wire in the connector and confirm whether it matches the grid tie specifications of the inverter 2 If not check whether the power distribution switch is closed and whether the power supply is operating correctly 3 If it matches connect the AC connector and close the AC Breaker if the problem persists call the local service department 1 Di...

Страница 17: ...hnical Data 7 1 Product Specifications GW136K HTH 205 1100 180 1000 200 750 12 30 12 45 12 2 136 150 150 500 3L PE 50 60 173 2 3 99 0 98 5 98 5 Environmental Parameters Level Temperature range Humidity range 3K3 0 C 40 5 to 85 4K2 33 C 40 15 to 100 4K4H 20 C 55 4 to 100 Interpretation of overvoltage levels Overvoltage level I Connect the product to a circuit with measures to limit instantaneous ove...

Страница 18: ...cuit LC Filter Output EMI Filter L1 L2 L3 PE AC SPD PV1 PV1 PV2 PV2 PV3 PV3 PV4 PV4 PV5 PV5 PV6 PV6 PV7 PV7 PV8 PV8 PV9 PV9 PV10 PV10 PV11 PV11 PV12 PV12 8 2 DC Switch Check In normal use the DC switch requires no maintenance Although not strictly necessary we still recommend you to check the DC switch regularly turn the DC switch on and off 10 times a year Operating the switch regularly can clean ...

Страница 19: ...switch of the inverter to the OFF position 8 3 Electrical Connection Check 1 Check whether the cable connection is loose 2 Check whether the grounding cable is reliably grounded 3 Check whether the waterproof covers for RS485 WiFi and other ports are sealed correctly Note The maintenance cycle is once every six months If the startup and shutdown sequences given above are not followed strictly the ...

Отзывы: