10
User‘s Manual
5 graphic diagram:
6 Operation:
1. Check the packing content by comparing it to the scope of
delivery for being complete and undamaged.
2. Check all used devices for being compatible to each other
by comparing their specifications.
3. Insert the AC input plug to a 230 V AC mains socket.
4. Connect one device to the 110 V AC output socket.
5. Remove all cable connections when not in use.
Do not leave the voltage converter unattended in use.
Operate the device under full load for max. 1 hour!
do nOT use power strips with the product!
- 1 pc. voltage converter
- 1 pc. user‘s manual
4 Scope of delivery:
housing
DC output socket
12 V DC
AC input plug
100-240 V AC
aTTenTIOn! risk of short-circuit!
Never bridge contacts!
Do not put things into ventilation slots or ports!
Содержание 54789
Страница 14: ...14 User s Manual...
Страница 15: ...15...