background image

 

GoBeam 6100 Quick Installation Guide 

 

UM000017 Rev 1.0 

1. 

 

Assemble the ‘T’ or ‘L’ Adapter 

Horizontal Installation 

Assemble the ‘T’ Adaptor to the  
GoBeam 6100 Unit. 

 

Vertical Installation 

Assemble the ‘L’ Adaptor to the  
GoBeam 6100 Unit. 

 

2. 

 

Install the Mounting Brackets 

 

When mounting the GoBeam 6100, the pole or wall mounting must 

support a minimum of 61.6 lbs (28 kg). In addition, the pole or wall 

mounting must support the wind loads from the GoBeam 6100. For 
example, the wind load at a wind velocity of 100 mph (160 km/h) is 

24.2 lbs (11 kg) and the wind load at a wind velocity of 165 mph 
(264 km/h) is 66.1 lbs (30 kg). 

 

Lorsque vous montez la GoBeam 6100, le poteau ou le montage mural 

doit supporter d'un minimum de 61.6 lbs (28 kg). En outre, le 

montage sur le poteau ou sur le mur doit appuyer les surcharges dues 
au vent de la GoBeam 6100 (par exemple, 24.2 lbs (11 kg) pour la 

vitesse du vent de 100 mph (160 km/h), 66.1 lbs (30 kg) pour 
l'énergie éolienne Vitesse de 165 mph (264 km/h)). 
 

Narrow Pole (1”-1.75” diameter) 

B

Pole

A

H

E

I

 

Normal Pole (1.75”-3” diameter) 

Pole

A

E

B

H

I

 

Flat Washer 

Spring Washer 

Hex Bolt 

“T” Adapter 

Flat Washer 

Spring Washer 

Hex Bolt 

“L” Adapter 

Отзывы: