GoBeam 6100 Quick Installation Guide
UM000017 Rev 1.0
1.
Assemble the ‘T’ or ‘L’ Adapter
Horizontal Installation
Assemble the ‘T’ Adaptor to the
GoBeam 6100 Unit.
Vertical Installation
Assemble the ‘L’ Adaptor to the
GoBeam 6100 Unit.
2.
Install the Mounting Brackets
When mounting the GoBeam 6100, the pole or wall mounting must
support a minimum of 61.6 lbs (28 kg). In addition, the pole or wall
mounting must support the wind loads from the GoBeam 6100. For
example, the wind load at a wind velocity of 100 mph (160 km/h) is
24.2 lbs (11 kg) and the wind load at a wind velocity of 165 mph
(264 km/h) is 66.1 lbs (30 kg).
Lorsque vous montez la GoBeam 6100, le poteau ou le montage mural
doit supporter d'un minimum de 61.6 lbs (28 kg). En outre, le
montage sur le poteau ou sur le mur doit appuyer les surcharges dues
au vent de la GoBeam 6100 (par exemple, 24.2 lbs (11 kg) pour la
vitesse du vent de 100 mph (160 km/h), 66.1 lbs (30 kg) pour
l'énergie éolienne Vitesse de 165 mph (264 km/h)).
Narrow Pole (1”-1.75” diameter)
B
Pole
A
H
E
I
Normal Pole (1.75”-3” diameter)
Pole
A
E
B
H
I
Flat Washer
Spring Washer
Hex Bolt
“T” Adapter
Flat Washer
Spring Washer
Hex Bolt
“L” Adapter