7-16
COMPONENTS
TEST PROCEDURES
RESULTS
CIRCUIT BOARD
TOUCH KEY
BOARD
See page 7-19 for “CHECKOUT PROCEDURES FOR THE CIRCUIT BOARD”
NOTE: A MICROWAVE ENERGY LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
Measure the resistance between terminal
pins of connector KEY CON.
NOTE:
When reconnecting the FPC connector,
make sure that the holes on the FPC
connector are properly engaged with hooks
on the plastic fastener.
MATRIX CIRCUIT FOR
TOUCH KEY BOARD
CONNECTOR(KEY CON)
Figure 26
Resistance
value
When
When not
touched
touched
Less than More than
400 ohms 1 mega ohm
1
2
3
4
5
6
7
8
9
10
11
12
13
FPC CONNECTOR
Top
Figure 27
TIMER
Ez On
CUSTOM
SET
FRESH
VEGETABLE
Содержание MV-1304B
Страница 9: ...5 1 SCHEMATIC DIAGRAM OVERALL CIRCUIT DIAGRAM ...
Страница 10: ...TIMER Ez On CUSTOM SET FRESH VEGETABLE 5 2 MATRIX CIRCUIT FOR TOUCH KEY BOARD ...
Страница 37: ...8 2 CONTROLLER PARTS 24781M 26638A 23572A 24810P 268711 24510L 24970A 250201 EV ...
Страница 39: ...8 4 LATCH BOARD PARTS 43501A 43500A 466001 466003 466001 EV ...
Страница 40: ...8 5 INTERIOR PARTS I 33390G 35889A 34036W 36549S 56170D 53300B 30RMZZ 56930G 54974A 56201B 56324A EV ...
Страница 42: ...8 7 INSTALLATION PARTS 63301M 65862B 65862D 949221 EV ...
Страница 43: ...8 11 SCHEMATIC DIAGRAM OF P C B ...
Страница 44: ......