8
3
SETTINGS
SETTINGS
ATTENTION!!!!
Boiler connected to the installation according to point II ELECTRICAL
ASSEMBLY. CH (HUW) pump should be turned on for III speed. Valves on
radiators should be completely open while start-up.
1. Red diode on – no. 20, boiler stand-by – boiler turned on.
2. For 5 s. Press button:
Green diode no. 19 turns on.
JEZYK
POLSKI
ENGLISH
OK
JEZYK
POLSKI
ENGLISH
OK
LANGUAGE
LANGUAGE
3. Choose language POLSKI / ANGIELSKI (ENGLISH).
– choose ENGLISH
– back to POLISH
– OK. Confirm language selection.
4. On LCD – sign „v progress bar”. One cannot skip this part. CH
(optionally HUW) pump turns on – there is no possibility to disconnect
heaters. Those 5 minutes should be sufficient to vent whole system
including boiler and pump. In case however another venting is essential
please repeat previous step.
5. On LCD – information according to description on page 7.
4
Venting
5
c
11:53:33
12 05 2011 THU
c
1
2
3
4
5
6
1
I – INITIAL SETTINGS:
1 CH and HUW
(concerns AsD-W and AsDC-W boilers only)
temp. setting
– press 1 time, enter function:
HUW
CH
– go to CH setting
– get back to HUW setting
50
50
HUW
.
CH
50
50
CONTROL PANEL
ESC
ON
CH and HUW temperatures are set in the same way.
OFF