GOLDEN TANDOORS GT -610AG Скачать руководство пользователя страница 10

GOLDEN TANDOORS

Step 1 : IGNITION OF PILOT 

GT-610AG & GT-710AG Tandoor Oven Installation & Operation Manual

Operation Procedure

The Tandoor Gas Circuit (Schematic Diagram GC-01) is equipped with 

a flame failure safety circuit that includes an initial pilot of lighting 

the main burner. 
Press the knob downwards (keep depressed) and rotate 

anticlockwise till a 30 degree turn (you will feel a mechanical stop). 

While the knob is still depressed fire the igniter (a couple of times). 

This shall ignite the pilot flame (diagram P-01). 

Keep the knob depressed for 10 to 15 seconds.
The first ignition will require the installer to purge air from the lines 

and may take a couple of attempts before burner remains light.

IGNITER

MAIN VALVE KNOB

PANEL ENLARGED VIEW

VALVE KNOB ROTATION 

ENLARGED VIEW

PILOT THERMOCOUPLE

IGNITER ASSEMBLY

GT-610710AG-2016V1-E

Diagrams Not To Scale

POINTS TO NOTE

1. Gas is only being delivered to the pilot in the first step.

2. The gas is not being delivered to the main burner.

3. After about 15 seconds the thermocouple will heat up for further 

transfer of gas to the main burner.

4. Pilot/burner ignition will be confirmed by sight  by opening the 

viewing panel on the front of the control box.

Step 2 : IGNITION OF THE MAIN BURNER 

Once the pilot is ignited and the thermocouple has taken heat you 

can release the depressed knob to turn it further anticlockwise to 

LOW. This shall be the slowest position of the burner where the 

burner should be ignited. 
The burner shall cross light and then you can turn the knob 

clockwise to HIGH for maximum flame.

POINTS TO NOTE

1. The pilot and the burner both shall run now.

2. The main valve has a simmer control (LOW) at the end of the turn.

3. Unless required heat the tandoor at low flame and then increase 

when desired.

4. Never keep your face on top of the main tandoor hole when 

igniting the main burner. A lot of heat is emitted when the main 

burners work.

THE TANDOOR IS NOW OPERATIONAL AND ONCE HEATED TO THE DEGREE 

REQUIRED AS PER THE NEED OF THE CHEF COOKING CAN BEGIN. 
IMPORTANT! DO NOT FORGET TO SLOW HEAT THE TANDOOR FOR THE FIRST 

TIME YOU OPEN THE PACKAGE. 
THE SLOW HEATING IS ONLY REQUIRED ONCE TO A NEW TANDOOR.

8

Diagram P-01

LOW

HIGH

SPARK

OFF

Содержание GT -610AG

Страница 1: ...or use gasoline flammable vapours or aerosols in the vicinity of this appliance while it is operation Improper installation adjustment alteration service or maintenance can cause property damage injur...

Страница 2: ...E HEREUNDER WITH RESPECT TO INFORMATION OR THE PRODUCTS TO WHICH INFORMATION REFERS GAS CODE LIMITATIONS The installation of this appliance must conform with local codes or in the absence of local cod...

Страница 3: ...10AG GT 710AG Tandoor Oven Installation Operation Manual GAS SPECIFICATIONS GT 610710AG 2016V1 E 1 Gas Inlet BOTTOM VIEW Gas Inlet Location Control Box Towel Hanger Rear Clearance Bumper Locking Casto...

Страница 4: ...NIMUM CLEARANCES GT 610710AG 2016V1 E 2 Dimensions Rear Bumper LHS RHS 110mm Clearance DO NOT REMOVE Gas Inlet SIDE VIEW TOP VIEW FRONT VIEW BOTTOM VIEW Model Width mm W Depth mm D Height mm H Mouth O...

Страница 5: ...lock If you have a wooden wall do not use the tandoor near it as the tandoor must not be used near combustible surfaces or materials including walls Warning If the restraint is disconnected for any re...

Страница 6: ...he sides only store in an upright position 3 WARNING Wear Protective eye cover and hand gloves while handling metal strips as they are locked with high tension and can harm if not handled professional...

Страница 7: ...AG GT 710AG Tandoor Oven Installation Operation Manual Specifications Gas Requirements Natural Gas Safety Sanitation All dimensions approximate rounded off 4 Gas Safety Equipped with Approved Flame Fa...

Страница 8: ...e attachment points and shall retain the appliances movement to 80 of the hoses length To avoid undue stress on pipework and burner adequate support should be used when connecting and disconnecting to...

Страница 9: ...check that the pilot with the thermocouple are intact not moved The Oven must be fired and tested for correct operation before commissioning the oven The appliance is tested and adjusted before leavi...

Страница 10: ...t 15 seconds the thermocouple will heat up for further transfer of gas to the main burner 4 Pilot burner ignition will be confirmed by sight by opening the viewing panel on the front of the control bo...

Страница 11: ...ve it unattended This process shall remove the moisture form the pot shall also ensure a settled pot THIS PROCESS AS MENTIONED ABOVE IS VERY IMPORTANT FOR THE LIFE OF YOUR TANDOOR POT AND MUST BE FOLL...

Страница 12: ...can cause corrosion Thereafter clean with warm water IMPORTANT The Tandoor should be checked and adjusted periodically by a qualified service personnel as part of a regular kitchen maintenance progra...

Страница 13: ...ul working life to the product and the end product 1 Never overheat your tandoor with the cover on 2 Shut the pilot when not cooking for long hours 3 Never leave your tandoor unattended 4 Keep heavy o...

Страница 14: ...r to clean burner If cleaning is not possible contact Golden Tandoors for purchase of a new suitable burner Do not replace the burner with any other brand the tandoor is calibrated with specific burne...

Страница 15: ...use In no event will Golden Tandoors and or its parent company be responsible for damages of any nature whatsoever resulting from the use of or reliance upon information from this site or the product...

Страница 16: ...GOLDEN TANDOORS AUSTRALIA GT 610710AG 2016V1 E Factory 18 87 91 Hallam South Road Hallam VIC 3803 Australia Tel 61 3 9796 4583 W www goldentandoors com au E sales goldentandoors com au...

Отзывы: