12
Floor Heater Cord
Figure 8
C. Installing the FRONT WALL PANEL, RIGHT SIDE WALL PANEL and LEFT SIDE WALL
PANEL
1. Place the FRONT WALL PANEL up onto the FLOOR PANEL. Align the Metal Guide Insert
Brackets on the FRONT WALL PANEL and the LEFT SIDE WALL PANEL. The LEFT SIDE
WALL PANEL will need to be lifted in order to lock the Metal Guide Insert Brackets onto the
FRONT WALL PANEL. Secure into place by pulling downward on the LEFT SIDE WALL
PANEL. Make sure the Metal Guide Insert Brackets are locked into place and the top of the
FRONT WALL PANEL is flush with the LEFT SIDE WALL PANEL. Do the same for the
RIGHT SIDE WALL PANEL. (see Figure 9)
Figure 9
D. Installing the REAR PANEL
1. Remove the protection paper/tape from the buckles on the REAR WALL PANEL. Place the
REAR WALL PANEL up onto the FLOOR PANEL. Next, attach the REAR WALL PANEL to
the LEFT SIDE WALL PANEL and use the buckles to latch together. Do the same for the
RIGHT SIDE WALL PANEL. (see Figure 10)
Содержание GDI/6434
Страница 6: ...6 PARTS DESCRIPTION GDI6202 GDI6444 ...
Страница 25: ...25 PAGE INTENTIONALLY LEFT BLANK ...